Council archive · source document
Noosa District Body Corp Approval · MCU13/0224
Very large file (15.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
1 July 2009 TO ALL OWNERS NOOSA DUNES GUIDELINES FOR BUILDING WORKS (NOOSA DUNES CTS 26506) The Body Corporate Committee has an obligation to help maintain the integrity of the Estate by approving proposed construction prior to the commencement of Council approval and any building work. This is a method of protecting the property values and the interests of all of the owners within the Estate. Owners can appreciate that the only way to ensure that buildings are built to a standard appropriate to the Estate is to seek forewarning of any development plans and for the Body Corporate Committee as the owners representatives to have the opportunity to review and comment upon the suitability of the proposed development. The Body Corporate Committee is of the opinion that owners are unlikely to erect buildings that are not in keeping with those that have already been constructed. However, the Committee has an obligation to all owners within the Estate to ensure that no construction detracts from the property values or from the general appearance of the Estate. The Committee also requires proof of compliance with current building codes, as well as RL requirements, building set-backs and natural vegetation zones as set down in the original plans for the Estate. These requirements are referenced in By-law 24(1) as 1016/1K, and were subsequently recorded by Council as ACA-1, TPC 2850. In 2008 our Plan of Development was one of only five taken up in the regional planning scheme under the Noosa Plan (see Noosa Plan, Schedule 6 reference Marcus Dunes ACA-1, TPC2850). At this time our Plan of Development was registered by Council as Plan 65, Sheet 1 of 1 which remains identical in all respects to 1016/1K and ACA-1, TPC 2850. Copy of Plan 65, Sheet 1 of | is available from Council). The Committee is particularly concemed where there are any proposed changes to the existing infrastructure such as a change in the position of the driveway crossover which may impact on utilities already installed, and any proposed changes to the existing rock retaining walls. Please submit final plans as early as possible to the Body Corporate Committee via the Body Corporate Manager when you propose to commence development of your vacant allotment. Please contact the Body Corporate Manager to ascertain current requirements for these submissions. R:\26506NoosaDunes Legal' Committee's GuidelinesforBuilding Works-010709-Amended1 704 13.doc Page 1 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa District Body Corp ApprovalRelated documentApplication case desk ↗
About this file
- File size
- 15.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.