Council archive · source document
Noosa District Body Corp Approval · MCU13/0224
Very large file (15.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
It is not the intention of the Body Corporate to delay the lodgment of building plans with Council and/or commencement of construction. The Committee will discuss any issues of concern with the land owners directly and will work to resolve any issues that it thinks may compromise common property or community interests. Matters will be resolved as amicably and promptly as possible. In the event that committee members may be personally impacted by proposed development, committee members may withdraw and the Body Corporate may seek independent advice and assessment of plans at sole cost to the Body Corporate. Conditions Applying to Buildings under Construction The Committee exercises control over building works to ensure that the security of the Estate is maintained and access by residents is not unnecessarily affected during construction work. For these reason the Body Corporate Committee provides the following Guidelines to owners, which will be applied to builders undertaking construction works, delivery vehicles, maintenance personnel, and service people. Construction Hours 1. To comply with the residents’ right to ‘quiet enjoyment’, construction work inside the Estate is strictly limited to between the hours of 7 am and 5 pm, Monday to Friday. Quiet work, such as internal painting, may proceed outside these hours as long as all other Guidelines are followed and access is arranged privately with the builder or lot owner. Gate Access & Security 2. To assist owners intending to commence construction on new homes the Body Corporate will arrange for the entrance gates to remain open during normal construction hours. Owners must advise the Committee Secretary of the planned construction start date to make arrangements for the Estate entrance gates to automatically open and close during the allowable building hours of 7 am to 5 pm. 3. The Body Corporate accepts no responsibility for Estate access beyond these hours. This must be arranged with the owner of the allotment under construction directly. 4. Under no circumstances are the gates to be tampered with, removed, or disabled in ANY way. Financial penalties will apply. Transport Size & Weight 5. Due to the narrowness and construction of the private roads within the Estate and the tight turns on Estate roundabouts, limits are in place on the size and weight of vehicles entering the estate. R:\26506NoosaDunes \Legal\Committee ‘sGuidelinesforBuilding Works-010709-Amended] 70413.doc Page 2 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa District Body Corp ApprovalRelated documentApplication case desk ↗
About this file
- File size
- 15.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.