3. Roof and surface runoff connection to Council’s drainage system shall be as shown on
drawing No. 10-1708 SW1A prepared by Mike O’Regan and Associates dated 20 June
2010.
4. A footpath 1.5 metres wide shall be constructed across the full frontage of the development.
The footpath shall have a slip resistant surface. The alignment shall be determined on site
with Council’s Construction Technical Officer. The expansion joints in any bikeway/footpath
shall be “sawcut”, not trowel jointed.
5. Suitable root barriers shall be installed where proposed trees are adjacent to paths,
pavement etc in accordance with Council’s Planning Scheme Policy PSP03 Landscaping
Plants and Guidelines.
6. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Engineering Officer Construction and shall be installed prior to the
commencement of any works.
7. Council’s Engineering Officer Construction (ph 07 5475 9866), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
8. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
9. Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
Council’s signed approved drawings and conditions by the applicant.
10. Please provide one copy (A3 size) of the approved plans and a copy of the job specifications
for Council’s Construction Technical Officer.
11. The Consulting Engineers for the project shall be currently Registered Professional
Engineers of Queensland (RPEQ). The Consulting Engineers are responsible for arranging
all inspections with Council’s Engineering Officer Construction or nominated staff.
12. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
13. Council standards shall apply to these works unless otherwise modified herein.
14. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Chief Executive Officer, Sunshine Coast Regional Council, and shall
forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the
Chief Executive Officer, Sunshine Coast Regional Council.
Page 2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved SPA Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.