All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request the Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the
commencement of the use.
In the case of any emergency Council shall be entitled to rectify such damage at the cost of
the Applicant, such cost being paid prior to the commencement of the use.
15. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
16. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by Council’s CEO.
17. All signage, including that for safety during construction shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
18. Safe pedestrian access on Grant Street in the vicinity of the development shall be
maintained at all times. Should footpath / road closures be necessary to carry out
construction works, Council’s Engineering Officer Construction (ph 07 5475 9866) must be
notified prior to the proposed closure.
19. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to
enter Council’s stormwater system or natural waterways. Although the sediment and erosion
control measures have been approved on drawing No 10-1708 ESC1A dated 15 June 2010
and drawing No 10-1708 ESC2A dated 20 June 2010 as prepared by Mike O’Regan and
Associates, it is the site's supervising engineer who is responsible for ensuring that the
sediment and erosion control measures have been designed by an RPEQ or CPESC and
constructed:
19.1. In accordance with "best practise" methods,
19.2. Revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and methods,
19.3. Revised to address predicted rainfall events, and
19.4. Achieve the desired environmental outcomes.
Council’s Chief Executive Officer may request further controls to be installed should
approved measures be inefficient.
20. The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant
traps in accordance with the manufacturers specifications.
21. The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant
traps on a weekly basis and after each storm event.
The owners of the subject property shall enter into an ongoing maintenance contract with a
Registered Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps
on a regular three monthly cycle and on an “On Call” basis in the case of an emergency.
The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall
be included in the Community Management Scheme for the completed development.
22. Certification of the completed works by the supervising engineer must be provided to
Council.
Page 3 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved SPA Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.