Hydraulic Assessment 29 August 2024
Attached to the e-mail Operational Works Application OPW25/0049 - Cover Letter, DA Form 1, Hydraulic Assessment 29 August 2024 - 38 Barina Ct_ Pomona - Email 1 of 2.
Parameter Result Required Length of Rock Pad 4.8 m Recommended Recess Depth, Z 0.35 m The location of the channel and rock pad energy dissipator are shown on the plan and section below. Figure 3.3: Spillway, Channel, Rock Pad, and 1% AEP Event Flood Velocity Figure 3.4: Spillway and Channel Longitudinal Section 38 BARINA COURT, POMONA I BBNE00000_0020-REP-001-0 11