Original source · versioned page text
2019-06-11 Planning & Environment Committee Agenda
The original of this document is very large (12.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 JUNE 2019
b. The retention of the three street trees to the western end of the Opal Street
frontage.
c. Sub-terrain tree planting area demonstrating at least 4m³ area of structured
soils per tree is available for root growth and is not subject to compaction.
d. Details and depths of all landscaping soils, especially where subject to
compaction relating to filling of the site.
e. Details of any signage proposed to be located within areas identified for
landscaping.
37. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
Stormwater Drainage
38. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval.
39. The plans submitted for the Operational Works approval must be prepared and
certified by suitably qualified RPEQ and include calculations in accordance with
Queensland Urban Drainage Manual and must confirm that that not increase in
stormwater runoff for all storm events up and including 1% AEP.
40. Stormwater runoff from the development must be disposed of on-site without causing
scour, damage or ponding on the subject site or any adjoining property.
Waste Disposal
41. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
and Industrial Premises”. The facilities must include an impervious area, within the
site, correctly sized for all refuse and recycling containers and suitably screened from
public places and neighbouring properties. A bin wash area is required with a cold-
water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
outlet must be designed to prevent storm water entry to the sewerage system.
42. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
43. Public bins must be provided throughout the car park to reduce littering. Bins
provided must be for refuse and recycling and be decanted into the bulk bins by the
site operators.
44. Service vehicle parking, manoeuvring and standing space along Diamond Lane must
be provided in accordance with the approved plans. The works must be undertaken
in accordance with an Operational Works approval.
RECONFIGURING A LOT
When Conditions Must Be Complied With
45. Unless otherwise stated, all works required by the conditions of this Decision Notice
must be completed prior to submission of the subdivision plan to Council for
compliance assessment.
Page 41 of 133
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.