PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 JUNE 2019
Easements
30. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
31. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
32. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
33. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
34. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Damage to Services and Assets
35. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Landscaping Works
36. The development site must be landscaped prior to the commencement of use. The
works must be undertaken in accordance with an Operational Works approval and
the Noosa Plan for that specific area and must include in particular:
a. The landscape areas generally shown on the approved Site Plan/Ground Floor
Plan Rev. A prepared by Andrew McKellar Design dated April 2019 with the
following amendments:
i. A minimum 2.0 metre-wide landscaping strip, within the lot, to the
Diamond Lane frontage adjacent to the full length of the building and
outside the area to be dedicated as lane. This landscaping must comprise
a mix of ground covers, shrubs and small trees
ii. The provision of island landscaping within the Opal Street road reserve in
the currently paved area between the scooter spaces and the car parking
spaces. The landscaping is to include a small tree.
iii. All trees to be a minimum pot size of 100 litres and consist of local native
tree species.
iv. Views of the tree planted on site at the corner of Opal and Elm Streets
must not be impeded by the proposed feature wall, the feature wall must
have a maximum height of 1200mm from natural ground level.
Page 40 of 133
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.