PROJECT
URBAN SZ
by more recent water quality policies. Covey Associates’ states that /t /s arguable that the targets
associated with the POD are not reflective of currently accepted data and are unrealistic, particularly as
data suggests undeveloped catchments generate pollutant loads in excess of the targets during storm
events.
It is noted that the submitted Stormwater Management Plan easily achieves current annual pollutant
load reduction objectives set by the State Planning Policy 2016. Council staff have also previously
provided the table below to Councillors confirming that the development complies with the SEQ Water
Development Guidelines 2012 for horizontal separation distances (setbacks) for dangerous and
hazardous substances.
1.2. Seqwater Development Guidelines 2012
The following Table 1 compares the developments setbacks with the Seqwater Development
Guideline's setbacks for Dangerous and Hazardous Substances Management, Storage and
handling with the developments’.
ns
Surveyed bank of an intermittent water | 50m Drainage line/feature 110m
course
Surveyed bank of a permanent water | 100m 250m
course
Nearest cut, embankment or other point | 30m N/A
where effluent might surface
Upper flood margin level of an urban | 400m 4km to Lake Macdonald
water supply storage
Natural grade 10% 4%
Flood immunity 1 metre above 1 in | N/A
50
The applicant requests that Council confirm how the water quality targets specified in the POD were
determined and what guidelines they reference. A meeting with key Council staff is also requested to
discuss the water quality targets that should apply to the site. Finally, if it is resolved that the POD's
water quality targets are redundant, it is requested that condition 27(e) is amended to reference the
State Planning Policy and Covey’s Stormwater Management Plan which achieves pollutant load
reductions well above required rates.
Should you have any questions with respect to the above, please do not hesitate to contact me direct.
Yours faithfully
PROJECT URBAN
— Vann
John McKennariey
Associate
Email: [email protected]
Page 29 of 78See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.