PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 JULY 2017
Application No Applicant Application Details Fees & Charges Fee proposed
Policy
OPW16/0069 TOD Noosa on 3 Emerald St Cooroy $871 Nil
behalf of IGA (IGA) – Roadworks
The proposal is to remove some overpour from the building foundations and to relay the paving in the
footpath area in front of the building at a more suitable crossfall grade. The works have been instigated by
the owner of the IGA and will be undertaken and paid for by the owner. Under the circumstances it is
recommended to waive the application fee, given the benefits to the community.
Application No Applicant Application Details Fees & Charges Fee proposed
Policy
Not yet lodged Martoo Visitor Accommodation $11,974 Base $27,921
Consulting on Type 4 Conventional
+ $435 +3 beds
behalf of client (extension to existing
visitor hostel) $12,409
106 Pacific Avenue, -$3,102
Sunshine Beach
- 25% existing
building
$9,307 x3
$27,921
The proposal is to apply to extend an existing visitor accommodation (Flashpackers) over an adjoining
site. The adjoining site is zoned Detached Housing and visitor accommodation is not identified as a
consistent use for the site under The Noosa Plan.
The proposal will require significant assessment, and is likely to result in submissions being made against
the proposal. The applicant will also need to demonstrate the need for more visitor accommodation and
that noise will be appropriately mitigated.
The fees for Visitor Accommodation Type 4 Conventional will be as per the Schedule of Fees & Charges
including a 25% reduction for the application in existing buildings with a multiplier of 3 imposed for an
inconsistent use.
It is recommended therefore that a fee waiver cannot be considered.
Previous Council Consideration
The fees and charges for development applications for the 2016/17 year were adopted by
Council at a Special Meeting on 29 June 2016.
Finance & Risk
The agreed variations to the development applications while reasonably significant (amounting to
$144,770) are considered appropriate and relative to the extent of work anticipated in the
assessment and had no significant impact on the budget for 2016-17.
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Nil
Page 74 of 78
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.