3 SITE DESCRIPTION

The construction area has a gradient in the order of 7%.

Vegetation on the construction area (and nearby surrounds) consists of grasses and scattered tall trees.
The trees are located on and adjacent the proposed construction site.

The existing surface drainage is good and sub-surface drainage is good.

4 FINDINGS
The soil profiles encountered are shown on the attached borelog sections.
No water table was encountered during our testing program.

The sandy soils encountered are susceptible to collapse when unconfined. This may effect excavations and
result in additional earthworks and increased concrete volumes. Temporary shoring or Forma-Tube may be
required to retain the sands prior to concreting.

The samples classified on-site were assessed as having negligible plasticity, therefore laboratory testing was
considered unnecessary.

We have assessed the expected differential movement of the soil profiles encountered to be the equivalent
of a site with a Ys of less than 20mm.

The following foundation material will provide a safe bearing capacity (100 kPa) for buildings within the scope
of AS 2870-2011 and is shown shaded on the attached logs;

FOUNDATION MATERIAL - NATURAL MEDIUM DENSE SILTY SANDS

5 SITE PREPARATION DETAILS

We recommend scraping this site free of all organic material and debris. The proposed construction area
should then be levelled suitable for the construction of a block base. The base must be fill, clean granular
material (i.e. crusher dust, clean sand, deco-rock or road base) and be free of any organic material and have
a clay content of less than 15% (Plasticity Index less than 25%). The fill is to be wetted and compacted in
150mm layers with a vibrating plate making 6 passes (3 in each direction). _In the area of the fill, the floor
slab and any services must be fully suspended on piers.

Where a retaining wall is required, a cut batter of 1 to 2 (vertical to horizontal) in the sand profile taken from
the base of the proposed wall should be excavated. These earthworks must incorporate shallow surface
spoon drains at the base and along the high side of the cut. Drains must have an efficient outflow down-
slope and clear of the construction area. The exposed face shouid aiso be protected against the potential for
stormwater erosion. Should these recommendations be un-achievable the builder should seek guidance
from this office on temporary shoring, benching or other suitable techniques. Backpropping to retaining walls
should be provided throughout the backfilling and compaction process.

Areas where existing structures or trees are removed shall be backfilled with engineer approved fill material
compacted to achieve a minimum relative field density of 95% and be in accordance with AS2870-2011.
Where trees are removed prior to construction the moisture conditions of the soils must be allowed to
normalise across the site prior to commencing foundation preparations.

Any loose or soft material uncovered in the site preparation shall be removed and replaced with approved fill

material compacted in accordance with AS2870-2011, or alternative measures to be provided by the
engineer.

SCG Consulting Engineers ie SCG Ref: 23360(S)

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Referenced Document - MCU13_0261 & OPW13_1037.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.