Council archive · source document
Referenced Document - MCU13/0261 & OPW13/1037
We recommend using a footing system as per the attached plans and details on the prepared construction pad. For the design to be valid the cut/fill ine must be in the position shown on our footing pian. Any variation must be brought to the attention of this office before continuing work. Site drainage during construction is important. Stormwater run-off should be diverted away from any foundation excavations and not be able to pond within 5.0m of the building footprint. Temporary piping or spoon drains or other practical methods should be used. Please refer to the Appendices to the rear of this report for drainage management. The final surface profile should fall away from any slab on ground for a minimum of 1.5m at a grade of no less than 1 in 20. Refer to appendices for drainage recommendations. Where site drainage and landscaping does not conform to the specifications of AS 2870-2011 and CSIRO Information Service Sheet BTF-18 significant damage to the building can be expected. A single copy of this document is issued with the original issue of this report. Please consult your builder or contact this office to obtain a copy. The builder must ensure the stability of neighbouring/existing structures is maintained through not undermining their foundations. This is achieved via restricting any excavations to above a line radiating downwards at an angle of 1 in 1.5 (vertical to horizontal) from the base of the foundation/structure to be protected. Any new vegetation including trees planted adjacent the structure should follow the recommendations appended to this report. 6 FOOTING AND SLAB SPECIFICATIONS Footing Details All footings must be founded a minimum of 300mm into the NATURAL MEDIUM DENSE SILTY SANDS (shown shaded on the attached log sections). Dimensions and reinforcement requirements are detailed on the structural plans and details. Where the NATURAL MEDIUM DENSE SILTY SANDS is deep or is covered by the introduction of fill, the footings are to be increased in depth to reach this level. Alternatively the footings can be supported on piers founded at or below the founding level. Refer to the structural plans for details. Where unexcavatable rock is encountered at depths shallower than the founding level, the strip footing (non- retaining) depth may be reduced accordingly to a minimum of 150mm providing the footing is founded a minimum of 100mm into un-weathered or un-disturbed rock. Additional reinforcement shall be provided in the footing at the rock/soil interface. Please contact SCG Consulting Engineers to obtain an appropriate detail. Drilled Piers Supporting the Footings Where the NATURAL MEDIUM DENSE SILTY SANDS is deep or to be covered by fill the footings can be supported on drilled concrete filled piers founded at a minimum of 300mm into the NATURAL MEDIUM DENSE SILTY SANDS. The size and spacing of these piers is nominated on the structural plans. Where drilling piers is not practical the footings could be supported on steel screw piers. Where unexcavatable rock is encountered at depths shallower the founding level the piers shall be augered a minimum of 100mm into un-weathered or un-disturbed rock. SCG Consulting Engineers 3 SCG Ref: 23360(S)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referenced Document - MCU13/0261 & OPW13/1037Related documentApplication case desk ↗
Referenced Document - MCU13/0261 & OPW13/1037Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.