Council archive · source document
Referenced Document - MCU13/0261 & OPW13/1037
Floor Slab Details The thickness and reinforcement for slabs on ground are shown on the structural plans. Ground slabs may require thickenings or stiffening beams incorporated in their construction. It may be advantageous to excavate them at the same time as the perimeter footings. Refer to the structural plans for the locations and extent of these. Where the stiffening beams intersect a perimeter footing, their base must be graded down to the footing base level, 3 x N12 bars must be cogged into the footing and lapped 500 with the beams trench mesh. Refer to the structural plans for details. A levelling layer under the ground floor slab is to comprise of granular material such as clean sand or crusher dust compacted in 150mm layers. Either well graded sand or crusher dust can be used. An approved polyethylene damp proof membrane of 0.2mm (min) thickness is to be placed over the levelling layer. Laps are to be a minimum of 200mm and be taped. All service penetrations and punctures are to be fully taped. The membrane is to be extended down the inside face of the perimeter footings and must continue under any thickenings or stiffening beams. Where rock is encountered within the slab area and encroaches within the slab depth it should be excavated to a level which enables placement of a 100mm (min) layer of granular material under the slab. Drilled Piers Supporting the Slab Slab piers are required where there is more than 300mm of uncontrolled fill beneath the slab. They are to be founded at a minimum of 300mm into the NATURAL MEDIUM DENSE SILTY SANDS. Special attention must be paid to the extra slab thickening required over slab piers as detailed in the structural plans. Where unexcavatable rock is encountered at depths shallower the founding level the piers shall be augered a minimum of 100mm into un-weathered or un-disturbed rock. Where drilled piers supporting columns or posts are not poured with the slab they must be connected to the slab in the following manner: e 4-N12 bars must be anchored 500mm into the drilled pier and be bent 300mm horizontally into the footing or slab as required. e Where a column penetrates a beam or footing 3-N12 bars must be bent around the column to lap the trench mesh by 500mm both sides. Drilled Pier Reinforcement [ Pier Depthmm | Perimeter Piers | Slab Piers | up to 1500 None required none required 1500-2500 2xN12bars none required 2500-4000 4xN12bars 2xN12bars 4000-6000 6xN12 bars 4xN12bars Pad Footing Details All pad footings must be founded to the depth nominated on the structural plans. Where this depth is not 300mm into the NATURAL MEDIUM DENSE SILTY SANDS they must be deepened down to this level. SCG Consulting Engineers 4 SCG Ref: 23360(S)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referenced Document - MCU13/0261 & OPW13/1037Related documentApplication case desk ↗
Referenced Document - MCU13/0261 & OPW13/1037Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.