Updated Plans - GIA - received 21.3.24 · MCU22/0172.02
Plans and drawings: the text below has words only, no drawings.
07 06 05 04 03 02 01
1,200 3,778 1,367 1,367 3,778 1,200
1,570
SCREEN
HEK-02 HEK-02 HEK-01 HEK-01
PARAPET LEVEL PARAPET LEVEL
RL 31.420 RL 31.420
BLK-01 BLK-01
SCR04 SCR04
700
700
P2 P2
UPPER LEVEL CEILING UPPER LEVEL CEILING
RL 30.720 RL 30.720
HEK-01
BOUNDARY
BOUNDARY
SLIDING
SCREEN
BLK-01
P4 W22 W21
2,700
2,700
UPPER LEVEL UPPER LEVEL
RL 28.020 RL 28.020
TIMBER PERGOLA TIMBER PERGOLA
SP SP
TIMBER POST W03 FIRE-01 FIRE-01 W10 TIMBER POST
3,000
3,000
TOW 26.020
FC-01
BAL-02 P2
RL 25.020 FC-01 P2
MID LEVEL BLK-01 BLK-01 MID LEVEL
RL 25.020 P2 RL 25.020
CONC-02 CONC-02 P2
BLK-01 G08
G03
P2
SCR04 SCR04
D01 STEEL WIRE STEEL WIRE D04
2,920
2,920
TRELLIS TRELLIS
GARAGE GARAGE
DOOR DOOR BLK-01 BLK-01
BLK-01 BLK-01
FINISH BLK-01 FINISH P1 P1
P1 P1
P4
LOWER LEVEL LOWER LEVEL
RL 22.100 RL 22.100
LB LB
1 WEST ELEVATION
- Scale 1:50 A B C D
5,940 8,950 1,900
SCR-04 SCR-06 HEK-02
RL 31.420
PARAPET LEVEL PARAPET LEVEL
RL 31.420 RL 31.420
BLK-01 BLK-01 BLK-01
700
700
UPPER LEVEL CEILING P2 P2 P4 UPPER LEVEL CEILING
RL 30.720 RL 30.720
BOUNDARY
BOUNDARY
W14
SCR-04 SCR-06 SCR-04
2,700
2,700
TOW 28.260
RL 28.020
UPPER LEVEL UPPER LEVEL
RL 28.020 TIMBER PERGOLA RL 28.020
BLK-01 BLK-01
TOW 27.460
P2 P4
TIMBER
1,800
BLK-01 SHS FIRE-01
POST
P2 W04 BLK-01
W05
BLK-01 BBQ - REFER JOINERY P4
FC-01
P2 PF-01 DRAWINGS
3,000
3,000
200
P2 BLK-01
P2 TOW 26.020
SP SP
1,000
POOL
BLK-01
1,000
BLK-01 TOW 25.195 CONC-02 P2
265
P2
MID LEVEL MID LEVEL
RL 25.020 RL 25.020
175
G03
CONC-02
2,920
2,920
LIFT TO RL 23.297
LOWER
LEVEL BLK-01
BEYOND P1
LOWER LEVEL LOWER LEVEL
RL 22.100 RL 22.100
2 NORTH ELEVATION
- Scale 1:50
notes : issue amendment log by date
project: north date: 19/03/24
07 ISSUE FOR REVIEW HC 30-05-23
1 The designs, drawings and specification are copyright and always
remain the property of Archend.
08 COORDINATION ISSUE HC 06-06-23 PROPOSED DUPLEX, drawn: JJ
2 Before commencing construction:
09
10
CONTRACT ISSUE
BUILDING APPROVAL
HC
PP
09-06-23
31-08-23
22 GRANT STREET, NOOSA HEADS, QLD 4567 checked: MS
-Verify all dimensions and levels.
11 ISSUE FOR BA RFI JJ 14/09/23 client: scale @ A1 : 1:50
-Verify location and levels of all services on site.
-Verify that floor levels and finished levels will enable connection to
12 ISSUE FOR BA RFI JJ 20/09/23 INTEGRA PARTNERSHIPS scale @ A3 : 1:100
13 ISSUED FOR CONSTRUCTION JJ 22/02/24 [email protected]
services.
14 ISSUED FOR CONSTRUCTION JJ 14/03/24 title: project/drawing no. sheet: A1
3 Do not scale this drawing. When in doubt refer to Designer. QLD. QBCC: 15226654
3 SCALE 1:50 1:50
ELEVATIONS
15 ISSUED FOR CONSTRUCTION JJ 18/03/24
16 ISSUED FOR CONSTRUCTION JJ 19/03/24 D22-056_A04-01_16
GSPublisherVersion 399.0.95.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Updated Plans - GIA - received 21.3.24.pdfRelated documentApplication case desk ↗
About this file
- File size
- 887 KB (small file)
- File type
No other editions are linked here.