SPECIAL MEETING AGENDA                                                         27 JANUARY 2021


           500557 –     A      Design Features - Carpark Area 2 prepared by Noosa     22 October
           DA04                Council                                                2020
           500557 –     D      Design Features – Pathway Connection prepared by       22 October
           DA05                Noosa Council                                          2020
           500557 –     A      Library Carpark Reconfiguration Plan prepared by       22 October
           DA06                Noosa Council as annotated by Council                  2020
           500557 –     A      Design Features - Carpark Area 3 prepared by Noosa     6 October
           DA07                Council as annotated by Council                        2020

          Currency Period
    3.    This development approval lapses if the use has not happened by 29 January 2027,
          unless an application to extend the currency period is approved by Council.
          Stormwater Drainage Management
    4.    Stormwater must be treated in accordance with the recommendations of the
          Stormwater Quality Management Plan Revision 1 prepared by Callaghan and Toth
          dated July 2020.
          Flood Risk
    5.    All infrastructure with potential to be impacted by flood waters, including electrical and
          plumbing fixtures and pump-room plant and equipment is to be located above 1%AEP
          flood level corresponding to year 2100 planning period.
    6.    An automatic flood warning system incorporating both an audible and visual alarm is
          to be provided to alert visitors to evacuate the site as soon as flood waters begin to
          impact the playground and with sufficient warning time to ensure full site evacuation
          prior to evacuation routes becoming inundated.
    7.    The playground design is to be amended to eliminate the risk of isolation of all site
          areas by rising flood waters. This may involve either modification to site levels or
          provision of linking elevated walkways and evacuation routes which remain flood-free
          until each area of the site which the evacuation routes service is itself inundated.
    8.    The playground design and associated flood model is to be amended to eliminate any
          increases in the flood levels affecting over-floor flooding at adjacent buildings for all
          flood events.
    9.    Provide an updated flood emergency preparedness and management plan which
          incorporates the above changes and which includes RPEQ certification that the
          proposed final playground design achieves an acceptable and tolerable level of flood
          risk. This plan must be completed and certified prior to commencing works on site.
          Car parking
    10.   56 additional car spaces must be provided prior to the commencement of the use of
          the playground. The car parking is to be provided in the following manner:
          a.    Lower Mill Road (22 additional formally sealed and line-marked spaces)
          b.    Maple Street road reserve (12 formally sealed and line-marked spaces)
          c.    Southern side of Mary River Road west of the tennis courts (22 spaces) be
                constructed as an overflow parking area.
    11.   The overflow parking area must be monitored for a full week in school holidays and a
          full week outside of school holidays after the playground has been fully operational for
          three months (and again at six months). The results of the surveys must be provided
          to Council’s Manager Development Assessment.
    12.   The overflow parking area must be formally sealed and line-marked if regular use is
          identified at either period of monitoring referred to in Condition 11.

                                                                                      Page 7 of 41
Log in to download the original file

2021-01-27 Special Meeting Agenda(PDF, 4MB).pdf · 4.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.