2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241)
Attached to the e-mail 2012-20394 SRA application correspondence.msg.
2012-20394 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)
No. Conditions Condition timing
Operational work that is assessable development under section 28 in tidal waters
Schedule 10, Part 17, Division 3, Table 2, Item 1— Operational work that is tidal works or works in a
coastal management district —The chief executive administering the Planning Act 2016 nominates the
Director-General of the Department of Transport and Main Roads to be the enforcement authority for
the development to which this development approval relates for the administration and enforcement of
any matter relating to the following conditions:
1. The development must be carried out generally in accordance with At all times
the following plans:
Site Plan, Layout Plan and Water Allocation prepared by The
Jetty Specialist, dated 11 November 2020, drawing number
JSP-SJ-33990 revision D.
2. The structure must be lit/marked in accordance with the following At all times
specifications, such that it does not cause a risk to the safe
navigation of other ships:
(a) Section 3 of AS4284-1997 Control of the obtrusive effects of
outdoor lighting.
3. The construction, operation or maintenance of the structure, and any At all times
ship berthed, moored or attached to the structure, must not:
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone.
4. Any debris or similar obstruction generated whilst undertaking the While works are
work must be removed from the waterway and suitably disposed of occurring
at the applicant’s expense.
5. All piles and/or structures to be demolished, both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works
Operational work that is tidal work or works in a coastal management district
Schedule 10, Part 17, Division 3, Table 1, Item1 — Operational work that is assessable development
under section 28 in tidal waters —The chief executive administering the Planning Act 2016 nominates
the Director-General of the Department of Environment and Science to be the enforcement authority
for the development to which this development approval relates for the administration and enforcement
of any matter relating to the following conditions:
6. The pontoon must be constructed generally in accordance with the For the duration of
following plan: works and to be
maintained
Site Plan, Layout Plan and Water Allocation prepared by The Jetty
Specialist, dated 11 November 2020, drawing number JSP-SJ-33990
revision D.
7. The works to which this approval relates are to be for a private At all times
purpose only.
8. Any operator and contractor involved in the works to which this During construction
approval relates must:
State Assessment and Referral Agency Page 3 of 8