2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241)

Attached to the e-mail 2012-20394 SRA application correspondence.msg.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                       2012-20394 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)


 No.     Conditions                                                                     Condition timing
 Operational work that is assessable development under section 28 in tidal waters
 Schedule 10, Part 17, Division 3, Table 2, Item 1— Operational work that is tidal works or works in a
 coastal management district —The chief executive administering the Planning Act 2016 nominates the
 Director-General of the Department of Transport and Main Roads to be the enforcement authority for
 the development to which this development approval relates for the administration and enforcement of
 any matter relating to the following conditions:
 1.      The development must be carried out generally in accordance with               At all times
         the following plans:

                 Site Plan, Layout Plan and Water Allocation prepared by The
                  Jetty Specialist, dated 11 November 2020, drawing number
                  JSP-SJ-33990 revision D.
 2.      The structure must be lit/marked in accordance with the following              At all times
         specifications, such that it does not cause a risk to the safe
         navigation of other ships:
             (a) Section 3 of AS4284-1997 Control of the obtrusive effects of
                 outdoor lighting.
 3.      The construction, operation or maintenance of the structure, and any           At all times
         ship berthed, moored or attached to the structure, must not:
             (a) encroach into, pass over or under a navigation corridor or
             (b) be located in a high risk maritime zone.
 4.      Any debris or similar obstruction generated whilst undertaking the             While works are
         work must be removed from the waterway and suitably disposed of                occurring
         at the applicant’s expense.
 5.      All piles and/or structures to be demolished, both above and below             Prior to the completion
         the waterline must be completely extracted/removed.                            of the works
 Operational work that is tidal work or works in a coastal management district
 Schedule 10, Part 17, Division 3, Table 1, Item1 — Operational work that is assessable development
 under section 28 in tidal waters —The chief executive administering the Planning Act 2016 nominates
 the Director-General of the Department of Environment and Science to be the enforcement authority
 for the development to which this development approval relates for the administration and enforcement
 of any matter relating to the following conditions:
 6.      The pontoon must be constructed generally in accordance with the               For the duration of
         following plan:                                                                works and to be
                                                                                        maintained
         Site Plan, Layout Plan and Water Allocation prepared by The Jetty
         Specialist, dated 11 November 2020, drawing number JSP-SJ-33990
         revision D.
 7.      The works to which this approval relates are to be for a private               At all times
         purpose only.
 8.      Any operator and contractor involved in the works to which this                During construction
         approval relates must:


 State Assessment and Referral Agency                                                                     Page 3 of 8
Log in to download the original file

2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241).pdf · 310 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.