2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241)
Attached to the e-mail 2012-20394 SRA application correspondence.msg.
2012-20394 SRA
(a) be provided a copy of these referral agency conditions;
(b) install all measures, plant and equipment necessary to
ensure compliance with the conditions of this approval;
(c) maintain such measures, plant and equipment in a proper
and efficient condition; and
(d) operate such measures, plant and equipment in a proper
and efficient manner.
9. For the pontoon, works only use materials which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
10. Should the works become damaged as a result of erosion, flooding At all times
or storm tide inundation, the registered landowners if the subject land
shall be responsible for the removal of all debris at their own
expense.
State Assessment and Referral Agency Page 4 of 8