Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241)

Attached to the e-mail 2012-20394 SRA application correspondence.msg.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                 2012-20394 SRA




             (a) be provided a copy of these referral agency conditions;
             (b) install all measures, plant and equipment necessary to
                 ensure compliance with the conditions of this approval;
             (c) maintain such measures, plant and equipment in a proper
                 and efficient condition; and
             (d) operate such measures, plant and equipment in a proper
                 and efficient manner.
9.      For the pontoon, works only use materials which are free from             During construction
        contaminants as defined under section 11 of the Environmental
        Protection Act 1994.
10.     Should the works become damaged as a result of erosion, flooding          At all times
        or storm tide inundation, the registered landowners if the subject land
        shall be responsible for the removal of all debris at their own
        expense.




State Assessment and Referral Agency                                                                Page 4 of 8
Log in to download the original file

2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241).pdf · 310 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.