Decision Notice - Council Meeting Decision MCU24 0074 · MCU24/0074
Pedestrian and Bicycle Facilities
46. Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:
a. the development must include 19 bicycle spaces as shown on the approved plans;
and
b. adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels.
Public Safety
47. During operating hours, all parking areas, pedestrian areas and entrances/exits to all
stairwells, lifts, foyers and public toilets must be well lit with vandal resistant lighting and
with intensities to satisfy the requirements of Australian Standard AS1158 “Public
Lighting Code”. Lighting must be designed to reduce the contrast between shadows and
well-lit areas. In particular, appropriate security lighting must be provided in the location
of the bicycle/ scooter parking and bin storage area.
48. After hours access to loading docks, storage areas and the basement carpark (including
the vehicle ramp and all stairwells) must be restricted by a security gate, lockable doors
and/or other suitably appropriate means. The basement carpark must be kept closed
and locked at all times while the use is not operating.
Stormwater Drainage
49. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval, be generally in accordance with RECOR’s Stormwater Management
Plan (20230025-SWMP01, Rev. 01) dated 30 May 2024 and the Queensland Urban
Drainage Manual.
50. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and Water by
Design’s Bioretention Technical Design Guidelines 2014, and must include in particular:
a. stormwater quality treatment devices of a size and location generally in
accordance with those shown in RECOR’s Stormwater Management Plan
(20230025-SWMP01, Rev. 01) dated 30 May 2024.
b. bioretention device(s) which:
a. are design generally in accordance with IPWEAQ Standard Drawing DS-
073, DS-075 and DS-076; and
b. are provided with a free-draining outlet from the sub-soil drainage system.
51. The development shall be provided with approved permanent signage to educate the
public on the function of the bioretention basin. The wording for the signage for the
bioretention basin is to include: “BIORETENTION BASIN – This bioretention basin
reduces the pollution of our waterways by reducing the amount of heavy metals, litter,
suspended solids, and nutrients discharged to the Noosa River”.
52. All bioretention basins must be maintained in accordance with Water by Design’s
Maintaining Vegetated Stormwater Assets (Version 1) 2009. Records of all maintenance
activities undertaken must be kept and made available to Council upon request.
53. All proprietary stormwater quality treatment devices must be routinely checked, serviced
and cleaned in accordance with the manufacturer’s recommendations. Records of all
maintenance activities undertaken must be kept and made available to Council upon
request.
Page 10 of 19
Document Set ID: 23655142
Version: 6, Version Date: 27/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records