Decision Notice - Council Meeting Decision MCU24 0074 · MCU24/0074
Landscaping Works
54. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that specific
area and must include in particular:
a. the landscape frontage works shown on the referenced documents are to achieve
a minimum of 1.0 metre width of landscaped area (clear of retaining structures) to
all frontages and a minimum overall site landscaped area of 10%.
b. landscaping adjacent carparks 02-11 inclusive, must incorporate 6 shade trees (1
tree per 2 car parks). The use of underground structural soil cells to create a
minimum of 5 square metres of suitable growing medium / area is required for
each tree.
c. vegetated screening of any electrical transformers, bin storage areas and the like
from the road frontage
d. provision of 1 street tree within the road reserve for every 8 metres of road frontage
55. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
Retention of Existing Trees
56. The existing trees within the road reserve and identified for retention on the referenced
must be retained in accordance with an Arborist Report (or part thereof) prepared by a
qualified person* and endorsed through an Operational Works approval. Should any
existing trees be required to be removed they shall be replaced with a suitably sized
specimen, bag size 200 litre min and approved by Council’s Design Coordinator –
Infrastructure Services.
*(Refer to Advisory Note)
57. Prior to the prestart meeting, a bank guarantee or a bond of $20,000 must be lodged as
security for the protection of the trees identified for retention in the conditions of this
approval. The bond:
a. may be drawn upon by Council in its entirety if any one tree identified for retention
is damaged to the point where the tree cannot be saved (as confirmed by the
project arborist and agreed in writing by Council)
b. will be returned upon practical completion of all the operational works relating to
this development.
Earthworks and Retaining Walls
58. The site is contained on the Environmental Management Register. Prior to the issue of
any Operational Works approval, the applicant must provide a ‘Site Suitability Statement’
confirming the site is suitable for the proposed use.
59. All earthworks and associated retaining structures/batters, both above and below
ground, both temporary and permanent, must be undertaken in accordance with an
Operational Works approval, be generally in accordance with RECOR’s Bulk Earthworks
Layout Plan (020, Rev. C) dated 20 December 2024 and contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must ensure that adjacent properties and associated
infrastructure is not disadvantaged by additional flows or adverse impacts on the
functionality of access driveways and carparks.
Page 11 of 19
Document Set ID: 23655142
Version: 6, Version Date: 27/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision MCU24 0074.pdfRelated documentApplication case desk ↗
About this file
- File size
- 225 KB (small file)
- File type
No other editions are linked here.