Council archive · source document

Decision Notice - Council Meeting Decision MCU24 0074 · MCU24/0074

of 19

Text shows just the words. Original shows the document exactly as it was published.

                        Any repair work which proposes to alter the alignment or level of existing services and
                        assets must first be referred to the relevant service authority for approval.
                        Acid Sulfate Soils
                 68.    A preliminary site-specific Dewatering and Acid Sulfate Soils Management Plan must be
                        prepared and submitted as part of a future Operational Works application for the site.
                        The Dewater and Acid Sulfate Soils Management Plan must be prepared by a suitably
                        qualified person and include, but not be limited to:
                        a.      testing, monitoring and treatment requirements for the works in accordance with
                                the National Acid Sulfate Soils Guidance; and
                        b.      demonstrate how groundwater encountered during excavations and ongoing
                                operations of the basement will be managed.
                        Demolition Works
                 69.    Unless specifically conditioned otherwise, all works must comply with the relevant
                        acceptable solutions as contained in the Waste Management Code and Water Quality
                        and Drainage Code of the Noosa Plan 2020.
                 70.    Demolition must be undertaken in a manner that causes no detrimental effect upon the
                        amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
                        borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
                        emissions in accordance with the nuisance provisions of the Environmental Protection
                        Act 1994.
                        Treatment of Temporarily Vacant Land
                 71.    Where some or all of the land remains vacant or undeveloped for more than 3 months,
                        or buildings are demolished and redevelopment is delayed for more than 3 months, the
                        following works must be carried out:
                        a.      the site must be cleared of all rubble, debris and demolition materials
                        b.      the site must be graded to prevent ponding (to the same level as the adjoining
                                footpath wherever practicable), turfed and mown at a minimum 3 weekly intervals
                        c.      the site must be landscaped with perimeter planting consisting of advanced
                                specimens of fast growing tree species
                        d.      the site must be maintained to ensure no nuisance to adjacent premises, roads or
                                footpaths
                        e.      where fencing is installed to secure boundaries:
                                i.     the fencing must be durable and not capable of being pushed or blown over
                                ii.    the fencing type must not detract from local amenity (barbed wire is not
                                       acceptable)
                                iii.   vandalism must be promptly repaired, and any graffiti removed.
                        Health and Safety
                 72.    All building materials containing asbestos, including asbestos cement sheeting or
                        roofing and lagging, are removed from the building prior to demolition or relocation.
                 73.    Removal of building materials containing asbestos must be undertaken by a licensed
                        asbestos removalist.
                 74.    Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
                        requires a licensed asbestos removalist to give notice to Workplace Health and Safety
                        Queensland (WHSQ) of licensed asbestos removal work at least five days before the
                        work commences. Notification must be made using Form 65: Notification of licensed
                        asbestos removal work, demolition work or emergency demolition.




                                                                                                          Page 13 of 19
Document Set ID: 23655142
Version: 6, Version Date: 27/03/2025

Used in these records

About this file

File size
225 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Council Meeting Decision MCU24 0074.pdf · 225 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.