60. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Waste Disposal
61. Prior to Council issuing a Development Permit for Operational Works, an amended
Waste Management Plan must be submitted to council for approval that allows for all
waste collection and servicing to occur on site. The amended Waste Management Plan
must be prepared by a suitably qualified person who is experienced in waste
management and includes in particular:
a. Onsite collection of refuse/recycling should be done using 1100ltr low noise waste
containers. Services to be done several times weekly to reduce the actual bin
numbers on site; and
b. provision for on-site servicing by a Refuse Collection Vehicle (Dennis Eagle Elite
2 6x4 with rear lift configuration) - the Refuse Collection Vehicle must be able to
enter the site from Albert Street, service the site, and exit on Thomas Street; and
c. compliance with The Noosa Plan 2020 – Waste Management Code and PSP9
Waste Management.
d. the Refuse Collection Vehicle (Dennis Eagle Elite 2 6x4 with rear lift configuration)
must enter via Albert Street and exit via Thomas Street.
62. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an
impervious area, within the site, correctly sized for all refuse and recycling containers
and suitably screened from public places and neighbouring properties. A bin wash area
is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
trap. The drain outlet must be designed to prevent storm water entry to the sewerage
system.
63. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
64. Storage, disposal and management of solid, liquid and vegetative waste is conducted in
a safe and ecologically sustainable manner without environmental nuisance. In this
regard, vegetated waste must be disposed of via a green waste bin or at a local transfer
station.
Services
65. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
66. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements of
this Decision Notice and all applicable legislation at the time of construction.
Damage to Services and Assets
67. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Page 12 of 19
Document Set ID: 23655142
Version: 6, Version Date: 27/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision MCU24 0074.pdfRelated documentApplication case desk ↗
About this file
- File size
- 225 KB (small file)
- File type
No other editions are linked here.