Original source · versioned page text
2014-05-29 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 29 MAY 2014
(e) a densely landscaped strip along the David Low Way and the unnamed road
frontage of the subject site, exclusive of the access driveway, bus stop and
pedestrian entry, generally uncompromised by infrastructure items to provide
vegetative structural screening of the development from the David Low Way
(f) A minimum of 4 x 100L street trees to the David Low Way frontage and 4 x
100L street trees to the unnamed road frontage shall be provided
(g) landscaping to raised planting beds along road frontages is adequately
supported by the provision of structured soils suitable for the approved planting
palette selection.
(h) All retaining structures and associated civil infrastructure are to be designed,
constructed and certified to accommodate the vegetative structural screening of
the development from the David Low Way when the trees are mature.
(i) All fencing to retaining walls tops must be of open construction and suitable for
purpose to ensure vegetative screening of the development
(j) Provide a 45L car park shade trees for every 4 car parking spaces including
structural soils to all beds
(k) Removal of all bioretention basins from front road setback areas to allow for
suitable screening vegetation
(l) Removal of the Pylon sign from the front boundary landscape setback area
(m) Landscaping trees to the David Low Way frontage must be of similar form and
type to existing landscaping to the eastern side of David Low Way
33.34. With any operational works application, provide details of the level spreader
and stormwater swale works outside the development area.
34.35. A 5 metre wide easement for access purposes must be registered against the
title of the property in favour of Council over the land area from the stub road to the
park dedication area on the subject site. The easement must be granted at no cost to
Council.
Parkland Restoration and Dedication
35.36. An Ecological Restoration Plan for the Park shall be prepared and submitted
for Council approval prior to the commencement of use. The park areas of the site
shall be revegetated and rehabilitated in accordance with the Council approved
Ecological Restoration Plan.
36.37. The Ecological Restoration Plan shall be prepared by a qualified and
experienced Ecologist, to the reasonable satisfaction of the Council. The Ecological
Restoration Plan (ERP) shall be applicable to the portion of the site to be dedicated to
Council as Parkland and address environmental weed removal and control,
rehabilitation of existing vegetation communities and revegetation strategies for
degraded areas of the area of the site to be dedicated as parkland. It shall identify all
the areas of the park that require ecological restoration, specify actions and works
necessary to result in robust, self-sustaining, viable indigenous plant communities
and habitat. The ERP shall aim to revegetate the park areas with suitable native
species to resemble the local endemic ecosystem by removing all environmental
weeds from the area. The ERP shall detail continual maintenance requirements for a
1 year period (the maintenance period) to enable the revegetation and rehabilitation
works to be self-maintaining.
37.38. The following, inter alia, shall be addressed and included in the Ecological
Restoration Plan and specifications:
(a) specify the required works and actions for each area in terms of:
(i) site preparation (this may include thinning, grass removal, weed removal
and control, etc.);
(ii) establishment of the missing floristic and structural elements;
Page 10 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.