ORDINARY MEETING AGENDA 29 MAY 2014
22.23. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 30 litres per second.
23.24. A single Unitywater installed primary water meter must be provided
immediately inside the property boundary. Additional water meters must be installed
for each title of a community title or sub-lease scheme. Meters must be Unitywater
approved, installed in accordance with Unitywater requirements and remain
accessible at all times for reading and maintenance purposes.
24.25. Water meters must be located on alternative boundaries to electrical pillars.
25.26. The existing Unitywater sewer infrastructure must be relocated clear of the
proposed building works prior to commencement of excavation on site.
26.27. Written approval to enter and construct must be provided from property
owners through which external sewers or relocated sewers traverse. This must be
submitted with lodgment of the associated development application for Operational
Works.
27.28. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ standards.
Easements shall be centred over the pipe. Easement terms shall be the most current
registered dealing held by the Department of Natural Resources & Mines and shall
not be altered or amended.
28.29. Buildings, basements and other structures must maintain a minimum
clearance of 1.5 metres from Unitywater sewer mains, and 1.0 metre from a sewer
manhole chamber or sewer inspection opening. Any proposed or existing retaining
wall crossing Unitywater sewer mains must be self supporting for a minimum of 1.0
metre each side of the sewer pipe and piered below the zone of influence of the
sewer.
29.30. Storm water retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 metres from Unitywater water supply and sewerage
infrastructure.
30.31. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre
from Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature, and
suitable approved varieties.
31.32. Construction works undertaken in the vicinity of Unitywater water supply or
sewerage infrastructure must not adversely affect the integrity of the infrastructure. All
costs associated with repair, replacement or alteration of infrastructure must be met
by the applicant.
Landscaping
32.33. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval, Planning Scheme Policy 3
Landscaping Plants and Guidelines and must include in particular:
(a) The works generally shown on the Approved Plans unless amended by these
conditions
(b) A minimum 3.5m wide landscaped area on the David Low Way frontage within
the site boundary, extending from the bus-stop to the intersection with the
unnamed road, with at least 2.5m of the landscaped area at road level
(c) The transformer is not to be located within the landscape setback areas
(d) A minimum 2m wide landscaped area on the unnamed road frontage within the
site boundary with at least 1.2m of the landscaped area at road level
Page 9 of 21