ORDINARY MEETING AGENDA 29 MAY 2014
Service Vehicles
48.49. Service vehicle parking, manoeuvring and standing spaces must be provided
on the site. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
(a) regular access for a SRV
(b) regular access for a LRV
(c) regular for a waste collection vehicle
Pedestrian and Bicycle Facilities
49.50. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
(a) a 2.5 metre wide concrete shared pathway within the road verge for the entire
length of the site’s frontage to David Low Way
(b) a 2 metre wide concrete pathway within the road verge for the length of the
site’s frontage to the unnamed road (Road 151) extending from the intersection
with David Low Way to the entrance to the site
(c) reinstatement of road cycle lanes (minimum of 1.5m in width) and green
pavement treatments to delineate bike land and neatly integrate with existing
bike land treatments.
Stormwater Drainage
50.51. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and must include in particular a detailed Stormwater
Management Plan (including MUSIC modeling and reporting) for the construction and
operational phases of the development that:
(a) demonstrates that there is no net increase in stormwater runoff (volume and
frequency) from the site
(b) includes stormwater quality improvement devices that achieve the current “best
practice” water quality objectives
(c) Sediment and Erosion Control Plan during the construction phases
(d) Provision to cater for the stormwater runoff from the adjoining properties and
roads that drain through the site, including registration of drainage easements
(e) All structures including infiltration pits, level spreaders etc, located within the
developable area of the site and clear of the area to be dedicated as Park.
51.52. All buildings proposed on site must be constructed to comply with Council’s
Minimum Floor Height requirements at the time of issue of the Building Permit.
Electricity and Telecommunication Services
52.53. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
53.54. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision Notice
and all applicable legislation at the time of construction.
Page 13 of 21