ORDINARY MEETING AGENDA 29 MAY 2014
Easements
54.55. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
55.56. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service authority,
the easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
56.57. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
57.58. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks must
be undertaken in accordance with the provisions of Australian Standard AS3798:
Guidelines on Earthworks for Commercial and Residential Developments.
58.59. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with
a commercial grade safety fence.
Acid Sulfate Soils
59.60. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a qualified person and
referenced in a Development Permit for Operational Works. In this regard appropriate
testing and supporting documentation prepared by a suitably qualified specialist must be
submitted to Council for approval prior to obtaining a Development Permit for Operational
Works.
Damage to Services and Assets
60.61. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the following times:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval; and
B. Find the following are sufficient grounds to justify the decision despite the conflict with the
Planning Scheme:
1. The proposal provides for a supermarket which will satisfy the top-up and
convenience shopping needs of residents and visitors of the locality, and is not
otherwise able to be accommodated within the existing Neighbourhood Centre.
2. The development is located directly opposite the Peregian Beach village and is
likely to complement and contribute to the village as the focal point for the
community.
3. The site has a current development approval which includes a significant retail
commercial component and is located between 2 existing commercial uses.
Page 14 of 21