RFI - Attachment 4B - Flora and Fauna Assessment Rev 5
Native Foresters
Performance Outcomes Acceptable Outcomes Response
f) building envelopes are designated for each lot;
and
g) ecological linkages and ecologically important
areas are secured by environmental covenant
or transferred to public ownership or through
gazettal of a nature reserve.
Management of impacts
PO3 AO3.1 Complies with PO3
Development is designed and sited to manage Where clearing of vegetation cannot be practicably
adverse impacts on ecologically important avoided, the development: The landfill expansion works cannot be practicably avoided
areas by: a) ensures the design and siting limits the loss of and the clearing requirements have been minimised as much
a) minimising the total footprint within vegetation to the smallest extent possible;
which all activities, buildings, b) protects and retains ecological values and
as possible.
structures driveways and other works ecosystem processes to the greatest extent
are contained; possible within and adjacent to the site; The proposed clearing will allow for the landfill expansion to
b) locating development in existing c) provides measures to allow for safe movement occur in accordance with the master plan for the site, and will
cleared areas or areas of low of fauna through the site; and require clearing of 1.02 ha of mapped vegetation – area of
ecological value over other areas to d) provides suitable habitat replacement and biodiversity importance.
the greatest extent possible; and replanting in accordance with PSP3 Ecological
c) incorporating siting and design Assessment Guidelines. Clearing vegetation is unavoidable, but the following is noted:
measures to protect and retain
• The proposed clearing is directly adjacent to the
ecological values and ecosystem AO3.2
processes within or adjacent to the Habitat trees, recruitment habitat trees, and roosting, existing cleared areas of the landfill site,
development site; and breeding and feeding areas are protected for native • Vegetation proposed to be cleared is a patch that is
d) where adverse impacts have been fauna habitat. surrounded on three sides by landfill areas and has
minimised, any residual impacts on been impacted by the uses of the landfill,
ecological values are compensated • Proposed works on the site include a HES Basin and
for through suitable habitat concrete crushing area which are positioned to
replacement and replanting on site in manage the expanded landfill footprint and ensure
the first instance or in a way that
stormwater flows from the site are properly treated.
results in a net gain and
enhancement of the overall habitat • Clearing will be undertaken to minimise impacts to
values of Noosa Shire. native fauna, by having a Wildlife spotter catcher
undertake pre-clearance survey and to be present for
all clearing.
• Retained vegetation will be managed to remove
weeds in accordance with a Weed Management
Plan, which will improve habitat values of the
Noosa Landfill & RRC – northern section – Fauna and Flora Assessment – REV4 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.