RFI - Attachment 4B - Flora and Fauna Assessment Rev 5
Native Foresters
Performance Outcomes Acceptable Outcomes Response
Clearing of vegetation does not involve clearing that may
cause or contribute to hillslope erosion, bank erosion, or
slippage.
Connectivity
PO5 AO5 Complies with PO5
Development is designed and operated to Development is designed and operated to maintain
maintain and enhance connectivity between ecological linkages and maximise opportunity for The vegetation proposed to be cleared is a 1.02ha of
and across ecologically important areas and connectivity and the movement of fauna by: vegetation “jutting” into the landfill site. It is shown within the
connecting habitat and support unimpeded and a) ensuring protection of wildlife refuges;
safe movement of terrestrial and aquatic fauna. b) maintaining vegetation in patches of the
Master Plan to be cleared for landfill uses.
greatest possible size and within the smallest
possible edgetoarea ratio; It does not link to vegetation in the south, east or west, but is
c) enhancing connectivity through planting and surrounded by landfill in these directions. It is connected to
rehabilitation works, including across property the bulk of vegetation (i.e. approx.. 270ha) on Lot 77 to the
boundaries, to areas of national park, state north.
forest or reserve;
d) avoiding the creation of physical barriers and The clearing will reduce the existing ‘edge’ of the patch
safety hazards (such as roads, pedestrian remaining inside the landfill area.
access and instream structures) along and
within the ecological linkage;
e) providing mitigation measures such as wildlife Fauna breeding habitat will be managed in accordance with
movement infrastructure, fauna exclusion and the approved SMP for the site.
directional fencing, underpasses/overpasses
and traffic calming devices, signage and An offset plan is detailed in Section 5.1 below to deliver an
lighting; and offset to support fauna to the south of the clearing area.
f) where offsets are necessary, delivering offsets
that support and enhance ecological linkages. The proposed works do not impact the connectivity to the north
to the adjacent national park.
Waterways and wetlands
PO6 AO6.1 Complies with PO6
The biodiversity and ecosystem values of Development and clearing of vegetation does not occur
waterways, wetlands and adjacent riparian within: The proposed clearing for the landfill expansion is shown in
zones are protected by: a) a riparian buffer area; the Noosa Council Overlay mapping to be within:
a) avoiding any new development in a b) a wetland area; or
riparian buffer area and wetland area; c) 10 metres either side of the centre line of other • MSES Environmental Values
b) retaining aquatic and terrestrial waterways identified on a Biodiversity, • Area of Biodiversity Significance
habitat in riparian zones; Waterways and Wetlands Overlay Map. Approximately 30m to the north of the clearing there is
c) maintaining and enhancing wildlife AO6.2 mapped:
corridors and connectivity along Development provides for the rehabilitation of land • Waterways
within:
Noosa Landfill & RRC – northern section – Fauna and Flora Assessment – REV4 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.