Appendix I - Bushfire Hazard Report
25
ASSESSMENT AGAINST THE SPP
A single State Planning Policy 2013 (SPP) came into effect in Queensland in December 2013 and
was since amended in 2017. The State Planning Policy (SPP) provides local governments with
guidance on a variety of State Interests and how they are to be dealt with in local planning schemes.
S5 Environmental understands the Noosa Plan, does not appropriately integrate the state interests
detailed in the SPP. Therefore, an assessment against Part E: State Interest Policies and Assessment
Benchmarks of the SPP (2017) in relation to Natural Hazards, Risk and Resilience has been provided
in Section 3.1 below. The relevant SPP Map is enclosed in Appendix A of this report.
6.1 Part E – State Interest Policies and Assessment Benchmarks
As outlined above, the proposed development needs to be assessed against the Planning for safety
and resilience to hazards requirements of the SPP 2017.
Table 6, below, is an assessment against Part E of the SPP in relation to Biodiversity and Natural
Hazards, Risk and Resilience. The proposal is for the Reconfiguration of a Lot with the development
of a residential lots and townhouses.
Table 6 Assessment of Part E State Interest Policies and Assessment Benchmarks
State Interest Policies Development Response
Outcome
Assessment Benchmarks – natural hazard, risk and resilience
These performance outcomes apply to the following development applications, to the extent the SPP has
not been identified in a local planning instrument as appropriately integrated.
A development application for a material change of use, reconfiguration of a lot or operational works on
premises in any of the following:
(1) Bushfire prone areas;
(2) Flood hazard areas;
(3) Landslide hazard areas;
(4) Storm tide inundation areas; and
Erosion prone area.
Erosion prone areas within a coastal management district:
(1) Development does not occur in an N/A The subject site is not located in a coastal
erosion prone area within a coastal management district or erosion prone area.
management district unless the
development cannot feasibly be located
elsewhere and is:
a. Coastal-dependent
development; or
b. Temporary, readily relocatable
or able to be abandoned
development; or
c. Essential community
infrastructure; or
d. Minor redevelopment of an
existing permanent building or
S50335ER002 BFA 10 & 22 Rose Gum Road and 521 Elm Street,
Black Mountain
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.