Appendix I - Bushfire Hazard Report
26
structure that cannot be
relocated or abandoned.
(2) Development permitted in (1) above, N/A Refer to above.
mitigates the risks to people and
property to an acceptable or tolerable
level.
Bushfire, flood, landslide, storm tide inundation, and erosion prone areas outside of the coastal
management district:
(3) Development other than that assessed A/S The proposed development has been centred
against (1) above, avoids natural in the lowest hazard section of the site which
hazard areas, or where it is not possible was rated as Low from the above Site Specific
to avoid the natural hazard area, Assessment. A 50 m strip around the
development mitigates the risks to perimeter of the development footprint has
people and property to an acceptable or been designated Medium Hazard due to the
tolerable level. addition of safety buffers.
The Concept Master Plan (Figure 3, above)
generally allows for these setbacks within
design. Minor amendments should be
considered on the western boundary.
S5 Environmental further understands from the
Concept Masterplan, that construction
materials and landscaping will generally be
low-flammability methods and materials – e.g.
concrete paths, mown turf, vegetable patches
and buildings.
All natural hazard areas:
(4) Development supports and does not S5 Environmental understand that the
hinder disaster management response proposed development will incorporate
or recovery capacity and capabilities. appropriate access for emergency services
given the nature of the proposed use and the
well-developed Emergency Response Plans
enacted on such sites.
(5) Development directly, indirectly and S5 Environmental understands the proposed
cumulatively avoids an increase in the development is to incorporate low-flammability
severity of the natural hazard and the landscaping throughout and around the
potential for damage on the site or to perimeter of the proposed development to
other properties. mitigate the risks of bushfire to people and
property.
(6) Risks to public safety and the S5 Environmental understand that hazardous
environment from the location of materials (where present on site) will be
hazardous materials and the release of appropriately located to minimise the risk of
these materials as a result of a natural release as a result of a natural hazard.
hazard are avoided.
S50335ER002 BFA 10 & 22 Rose Gum Road and 521 Elm Street,
Black Mountain
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.