Table 8.2.9.4 Criteria for assessable development - Gas pipeline and Major Electricity Infrastructure
Performance outcomes Acceptable outcomes Compliance
Gas pipeline corridor and buffer area
PO1 AO1.1 Not relevant to this application.
Development, including uses and works are Buildings and structures are setback a minimum of 40 The site is not in a gas pipeline corridor and buffer area on the
constructed and operated to avoid: metres from a gas pipeline corridor. Regional Infrastructure Overlay Map.
1. compromising the viability of the gas AO1.2
pipeline corridor; or The use does not involve the storage of flammable,
2. damaging or adversely affecting the explosive or other hazardous materials within 200
existing or future operation of a gas metres of the gas pipeline corridor.
pipeline within the gas pipeline corridor. OR
AO1.3
Written conformation of the pipeline license holder
of Petroleum Pipeline License 32 that
the setback distance and design of the development
does not impact the future use of the gas pipeline.
Editor's note- should a lesser setback distance be
proposed, it is recommended that the applicant
consult with the relevant gas pipeline manager prior
to the lodgement of a development application to
determine how compliance with the performance
outcome can be achieved.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.