Appendix C - Stormwater Management Plan
The original of this document is very large (31.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn31 October 2018
5.4.4 Maintenance
For the Stormwater 360 Enviropods and Stormfilters, maintenance can be performed with a vacuum
truck to remove captured soil, sediment and floatables. Detailed maintenance techniques can be found
in the Stormwater 360 Operations and Maintenance Manual attached in Appendix 4.
5.5 Construction Phase (Sediment and Erosion Control)
5.5.1 Intent of Erosion and Sediment Control Management Plan
To prevent stormwater contamination (of watercourses) and the release of contaminated stormwater
and wastewater by ensuring compliance with the Environmental Protection Act 1994 and
Environmental Protection (Water) Policy 2009.
5.5.2 Implementation Strategy
Establish control measures and best practice approaches to prevent stormwater contamination and
minimise the risk and adverse effects of erosion and sedimentation. All Erosion and Sediment Control
measures must be designed, constructed and maintained in a manner that is commensurate with the
site’s erosion risk.
5.5.3 Erosion and Sediment Control Measures
Obtain a licence or approval to operate activities that are classed as environmental relevant
activities (i.e. they have the potential to cause environmental harm).
Implement and maintain appropriate control measures to prevent sediment leaden wastewater
and other potential pollutants such as oil, paint and wet concrete from entering the stormwater
system via stormwater drains and gullies. The control measures which must be considered to be
adopted are:
Limit site access during construction to minimise disruption to traffic
Install a temporary construction entry/exit sediment trap at all site accesses to
minimise mud and sediment from the site being tracked onto public road, particularly
during wet weather or when the site is muddy.
Install and maintain appropriate sediment fences around construction areas
Divert clean stormwater runoff, using catch drains, around construction areas
to existing or new stormwater drainage system.
Install sandbags and other pollution containment devices around stormwater
drains and any other locations where required to prevent sediment entering
the trunk stormwater system.
Cover open earth/soil areas progressively (with concrete slabs and pavements
or mulch) to minimise areas of bare earth/soil.
Any stockpiles of excavated soil and demolition / construction waste must be
located where risk of erosion and sediment is minimal, and must be protected
from wind and water erosion.
Implement and maintain appropriate control measures such as catch drains and
sediment fences to prevent ponding of stormwater or discharge of stormwater from
the site to adjacent properties.
Provision of spill / pollution control equipment that is readily accessible to clean up
spills and leaks.
Excellence with Economy in Engineering 15
l:\7000-7999\7700-7799\7700\reports\31-10-18 stormwater management plan_issue b.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.