Original source · versioned page text
Appendix C - Stormwater Management Plan
The original of this document is very large (31.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn31 October 2018
Ensure spill/pollution control measures are available and maintained in working
condition.
Sediment contained by the sediment control devices such as sandbags, sediment fences
and containment bunds must be frequently removed and placed in a controlled area.
Implement an inspection schedule for any spill or leaks of any potential polluting areas
or activities.
5.5.4 Erosion Sediment Control Management Goals
Licenses, approvals, permits and inspection reports are in order.
Sediment or pollution control devices such as sandbags, sediment fences and containment
bunds are in place, maintained and effective.
Spill/ pollution control equipment is readily accessible at designated locations.
No accumulated sediment is contained by the sediment control devices such as hay bales,
sediment fences and containment bunds.
No sediment exceeding a depth of 300mm in the pollution control devices (e.g. silt trap).
5.5.5 Erosion and Sediment Control Implementation Program
Licenses, permits or approvals for each environmentally relevant activity must be obtained
prior to the commencement of the particular activity.
Appropriate control measures such as sediment fences, temporary construction entry/ exit
sediment traps, pollution containment devices (e.g. sandbags), stormwater diversion and
administrative controls must be installed and established prior to commencement of the
earthworks and construction activities.
Pollution control devices such as spill control equipment must be inspected on a regular basis
(at least weekly).
Other sediment and pollution control equipment such as containment bunds, hay bales and
sediment fences must be inspected on a regular basis (at least daily).
Inspection for any leaks, spills or potential contaminating activity must be performed on a
regular basis (at least daily).
Remove accumulated sediment or other contaminants from sediment/ pollution control devices
on a regular basis.
All erosion and sediment control measures must be inspected within 24 hours of expected rain
and within 18 hours of a rainfall event.
5.5.6 Responsible Person Or Organisation
The contractor shall be responsible for the implementation and maintenance of the Erosion and
Sediment Control Measures.
5.5.7 Reporting / Review
Records such as licences, approvals, permits and inspection reports must be reviewed on a regular basis
(e.g. at least monthly) to ensure that legal compliance is met, complaints are reviewed and systems are
working to prevent contamination.
Excellence with Economy in Engineering 16
l:\7000-7999\7700-7799\7700\reports\31-10-18 stormwater management plan_issue b.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.