Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Appendix C - Stormwater Management Plan

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (31.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
31 October 2018


5.5.8 Corrective Actions

          Perform clean-up of any spills immediately.
          Any mud or sediment which is tracked onto public roads is to be immediately removed using dry
           clean-up methods i.e. shovel and broom.
          Remove or relocate any stockpiles of waste where there is a reasonable risk of erosion and
           sedimentation.
          Replace or repair sediment or pollution control devices if they are not maintained in good
           working condition.


6         CONCLUSION
This Stormwater Management Plan demonstrates that under the proposed concept plan stormwater
quality and quantity treatment is achievable to the levels required by State Planning Policy July 2017.

Detention and treatment will be provided in the form of a combined treatment / detention tank within
the proposed development lot.



7         LIMITATIONS OF REPORT
MPN have prepared this report for the proposed Medical centre development at Hofmann Drive in
accordance with MPN’s proposal to Ribarja Property. This report is provided for the exclusive use of the
Ribarja Property for this specific project and its requirements. It should not be used or relied upon by a
third party and MPN accept no responsibility for the use of this report by any party other than Ribarja
Property.




Excellence with Economy in Engineering                                                                       17
l:\7000-7999\7700-7799\7700\reports\31-10-18 stormwater management plan_issue b.docx
Log in to download the original file

Appendix C - Stormwater Management Plan.pdf · 31.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.