Original source · versioned page text
DILGP_CAR with conditions_SDA-0816-032888 (I)
Attached to the e-mail Referral agency response MCU16/0090.
SDA-0816-032888 Our reference: SDA-0816-032888 Council reference: MCU16/0090 Your reference: SUN/010816 Attachment 1—Conditions to be imposed No. Conditions Condition timing Development Permit – Material Change of Use – Wellbeing Type 2 - Social Schedule 7, Table 3, Item 1 – State-controlled road – material change of use —Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Transport and Main Roads to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): In accordance with approved plans 1. The development must be carried out generally in accordance Prior to the with the following plans: commencement of use and to be Landscape Concept Plan, prepared by Sunshine maintained at all Gardens, dated 20 September 2015, drawing no. L002, times. Revision A, as amended in red on 4/11/16 by TMR; and Basic Right Turn Lane Treatment (BAR) Layout, prepared by TOD engineers and project managers, dated 28 July 2016, drawing no. 16520_SK1, revision A Vehicular access to the state-controlled road (a) At all times. 2. (a) The road access location(s), is to be located generally in accordance with: Landscape Concept Plan, prepared by Sunshine Gardens, dated 20 September 2015, drawing no. L002, Revision A, as amended in red on 4/11/16 by TMR. (b) Prior to the (b) Road access works comprising a Basic Right Turn (BAR) commencement and Basic Left Turn (BAL) treatment for the entry driveway, of use and to be and a rural driveway standard (both driveways) must be maintained at all provided at the road access location(s). times. (c) The road access works must be designed and constructed (c) Prior to the in accordance with: commencement of use and to be - IPWEA RS-056 Driveway 4.0m width and sealed from the maintained at all edge of the sealed road shoulder to the property times. boundary, with minimum 450mm dia. RCP culvert and sloping headwalls; and Department of Infrastructure, Local Government and Planning Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.