                                                                                         SDA-0816-032888




No.        Conditions                                                           Condition timing
                -     TMR’s Road Planning and Design Manual.

Removal of redundant road access works

3.         The existing vehicular property access as detailed in Landscape      Prior to the
           Concept Plan, prepared by Sunshine Gardens, dated 20                 commencement of
           September 2015, drawing no. L002, Revision A, as amended in          the use.
           red on 4/11/16 by TMR must be permanently closed and
           removed.

Design Vehicle and traffic volume

4.         The road access location is restricted to an entry only (western     At all times.
           driveway) and exit only (eastern driveway) arrangement, as
           detailed in Landscape Concept Plan, prepared by Sunshine
           Gardens, dated 20 September 2015, drawing no. L002, Revision
           A, as amended in red on 4/11/16 by TMR.

Stormwater management

5.         (a) Stormwater management of the development must ensure no
                                                                                (a) At all times.
               worsening or actionable nuisance to the state-controlled road.

           (b) Any works on the land must not:
               i. create any new discharge points for stormwater runoff
                  onto the state-controlled road;                               (b) At all times.
              ii. interfere with and/or cause damage to the existing
                  stormwater drainage on the state-controlled road;
             iii. surcharge any existing culvert or drain on the state-
                  controlled road;
             iv.  reduce the quality of stormwater discharge onto the state-
                  controlled road.

            (c) RPEQ certification must be provided to the Department of
                Transport and Main Roads, confirming that the development       (c) Prior to the
                has been designed and constructed in accordance with                commencement
                parts (a) and (b) of this condition.                                of use.




Department of Infrastructure, Local Government and Planning                                Page 5
Log in to download the original file

DILGP_CAR with conditions_SDA-0816-032888 (I).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.