Figure 5.2 – Music Modelling Results The modelling results show the pollutant reduction objectives are met for all contaminants listed in Table 5.1. Details of the proposed bio-retention basin are provided in the Stormwater Management Plan drawing no: SCG 31131- SW1.1 thru SW1.5 (Appendix D). 6.0 STORMWATER QUANTITY Noosa Shire Council’s Planning Scheme – Noosa Plan 2020, require post development peak flows leaving the development site will not exceed the pre-development peak flow rates for the required design storms. Peak flow increases will be minimised by the provision of an On-site Detention (OSD) basin fitted with a low flow orifice plate to detain a portion of the runoff from the site and limit the peak flow rates of pre-development levels. SCG Consulting Engineers Page 15 SCG Ref: 31131(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.