Original source · versioned page text
RFI - SWMP.pdf
6.1 Rational Method
To calculate the peak discharges for the site under existing (pre-development) and proposed (post-
development) conditions the rational method has been used in accordance with QUDM 2017.
6.1.1 Design Storms
As defined in the Noosa Plan 2020 stormwater drainage must be designed in accordance with QUDM
2017, therefore the following design storms were adopted: -
1. Minor Drainage System - 10 Year ARI (Q10 Storm)
2. Major Drainage System - 100 Year ARI (Q100 Storm)
6.1.2 Rainfall Intensity
Rainfall intensities were obtained from The Australian Bureau of Meteorology. Refer to Appendix F
for the IFD design rainfall intensity.
6.1.3 Time of Concentration
Times of concentration (Tc) were calculated as defined in QUDM 2017. Refer Table 6.1 for Adopted
time of Concentrations and Appendix E for calculations: -
Table 6.1 – Tc Values
STATE CATCHMENT A (Tc) (mins) CATCHMENT B (Tc) (mins)
Pre Development 5 13.00
Post Development 5 5.67
SCG Consulting Engineers Page 16 SCG Ref: 31131(SWMP)
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (RFI - SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.