6.1.4 Runoff Coefficient (C10)
The 10year runoff coefficients (C10) were calculated as defined in QUDM. Refer to Table 6.2 for
Adopted C10 Values: -
Table 6.2: C10 Values
STATE CATCHMENT A (C10) CATCHMENT B (C10)
Pre Development 0.78 0.74
Post Development 0.88 0.88
6.1.5 Peak Flows
Table 6.3 below displays a summary of major and minor discharge rates for pre and post development
conditions using the rational method. Refer to Appendix E for calculations: -
Table 6.3: Pre and Post Development Peak Flow Rates
Condition Q1 Q2 Q5 Q10 Q20 Q50 Q100
(m3/s) (m3/s) (m3/s) (m3/s) (m3/s) (m3/s) (m3/s)
Pre Development 0.010 0.013 0.019 0.024 0.029 0.037 0.042
Catchment A
Post Development 0.028 0.034 0.051 0.063 0.076 0.095 0.105
Catchment A
Pre Development 0.063 0.076 0.114 0.140 0.167 0.210 0.240
Catchment B
Post Development 0.070 0.084 0.128 0.159 0.191 0.241 0.266
Catchment B
Total 0.074 0.089 0.134 0.164 0.195 0.247 0.282
Pre Development
Total 0.098 0.118 0.179 0.222 0.267 0.336 0.370
Post Development
SCG Consulting Engineers Page 17 SCG Ref: 31131(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.