Council archive · source document
Rfi - Swmp · MCU21/0156
6.4 Downstream Infrastructure Consideration To determine if the existing lawful points of discharge for Catchment B is capable to safely convey the post development mitigated flow we have modelled the existing drainage infrastructure as discussed in Section 4.1 using the software PC DRAINS. The modelling has demonstrated that all post development mitigated peak flows up to Q100 can be safely contained within the existing 375m2 diameter stormwater line traversing the rear of Lot 101 on SP106085. The pipe longitudinal sections and calculations have been exported and are shown in Appendix D. Catchment A will result in a increased discharge to the Eumundi Noosa Road kerb and channel, however this has been limited to a Q10 flow rate of 25Lt/s at each kerb adaptor location as per Noosa Council requirements. The net total discharge from the proposed site will remain below pre development flows for all storms from Q1 up to Q100. 7.0 FLOODING Information provided from Noosa Council’s Flood Hazard Overlay Map confirms the site is unaffected by flooding. SCG Consulting Engineers Page 22 SCG Ref: 31131(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.