Original source · versioned page text
RFI - SWMP.pdf
6.4 Downstream Infrastructure Consideration To determine if the existing lawful points of discharge for Catchment B is capable to safely convey the post development mitigated flow we have modelled the existing drainage infrastructure as discussed in Section 4.1 using the software PC DRAINS. The modelling has demonstrated that all post development mitigated peak flows up to Q100 can be safely contained within the existing 375m2 diameter stormwater line traversing the rear of Lot 101 on SP106085. The pipe longitudinal sections and calculations have been exported and are shown in Appendix D. Catchment A will result in a increased discharge to the Eumundi Noosa Road kerb and channel, however this has been limited to a Q10 flow rate of 25Lt/s at each kerb adaptor location as per Noosa Council requirements. The net total discharge from the proposed site will remain below pre development flows for all storms from Q1 up to Q100. 7.0 FLOODING Information provided from Noosa Council’s Flood Hazard Overlay Map confirms the site is unaffected by flooding. SCG Consulting Engineers Page 22 SCG Ref: 31131(SWMP)
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (RFI - SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.