SCG 31030 Stormwater Management Plan · OPW22/0319
Plans and drawings: the text below has words only, no drawings.
Mitigating Measures
• Well established refuse areas with ample storage bins. Fenced off where deemed necessary.
• Provision of ample litter bins across the commercial footprints of the site. Particularly in any
outdoor dining or areas of congregation.
• Promotion of stormwater surface runoff through landscaped areas or similar sediment traps.
• Promotion of stormwater surface runoff through landscaped areas or similar sediment buffering
strips/traps.
• Provide stormwater pits outside paved areas that receive runoff from areas prone to gross
pollutants with surrounding buffering measures, such as stone pitching.
• Provide gross pollutant inserts into stormwater pits within paved areas that receive runoff from
areas prone to gross pollutants.
Nutrient Runoff:
Nutrients such as Nitrogen and Phosphorus can be mobilized and transported in Stormwater runoff from the site.
This can compromise Water Quality Objectives.
Potential Causes
• Runoff from hard surfaces within the site.
• Detergents used in car washing and similar activities.
• Fertilisers used in propagation of landscaped areas.
• Embodied nutrients contained in silt (topsoil) runoff.
• Embodied nutrients contained in runoff.
Mitigating Measures
• Implement management plan for landscaping propagation. Use stable organically bound
fertilizers cultivated immediately prior to turf placement. Mulch over areas of exposed topsoil.
• Construction of silt fences during construction and maintained beyond completion of landscaping.
• Capture roof runoff and store for re-use.
6.0 STORMWATER QUANTITY:
Noosa Shire Council require no significant increase in stormwater runoff post development of sites.
To achieve this we are proposing to include a detention tank with a low flow orifice to detain a portion of the runoff
from the site and limit the flow rates to pre-development levels.
6.1 Rational Method:
To calculate the peak discharges for the site under existing (pre-development and proposed post-development)
conditions the rational method has been used in accordance with QUDM 2018.
SCG Consulting engineers 6 SCG Ref: 31030(SWM)
[OCR of page images]
Mitigating Measures
° Well established refuse areas with ample storage bins. Fenced off where deemed necessary.
° Provision of ample litter bins across the commercial footprints of the site. Particularly in any
outdoor dining or areas of congregation.
° Promotion of stormwater surface runoff through landscaped areas or similar sediment traps.
° Promotion of stormwater surface runoff through landscaped areas or similar sediment buffering
strips/traps.
° Provide stormwater pits outside paved areas that receive runoff from areas prone to gross
pollutants with surrounding buffering measures, such as stone pitching.
° Provide gross pollutant inserts into stormwater pits within paved areas that receive runoff from
areas prone to gross pollutants.
Nutrient Runoff:
Nutrients such as Nitrogen and Phosphorus can be mobilized and transported in Stormwater runoff from the site.
This can compromise Water Quality Objectives.
Potential Causes
° Runoff from hard surfaces within the site.
° Detergents used in car washing and similar activities.
° Fertilisers used in propagation of landscaped areas.
° Embodied nutrients contained in silt (topsoil) runoff.
° Embodied nutrients contained in runoff.
Mitigating Measures
° Implement management plan for landscaping propagation. Use stable organically bound
fertilizers cultivated immediately prior to turf placement. Mulch over areas of exposed topsoil.
° Construction of silt fences during construction and maintained beyond completion of landscaping.
° Capture roof runoff and store for re-use.
6.0 STORMWATER QUANTITY:
Noosa Shire Council require no significant increase in stormwater runoff post development of sites.
To achieve this we are proposing to include a detention tank with a low flow orifice to detain a portion of the runoff
from the site and limit the flow rates to pre-development levels.
6.1 Rational Method:
To calculate the peak discharges for the site under existing (pre-development and proposed post-development)
conditions the rational method has been used in accordance with QUDM 2018.
SCG Consulting engineers 6 SCG Ref: 31030(SWM)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 31030 Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.