Council archive · source document
SCG 31030 Stormwater Management Plan · OPW22/0319
Plans and drawings: the text below has words only, no drawings.
6.1.1 Design Storms:
Stormwater Drainage of the NSC Planning Scheme Policy outlines the following design storms.
1. Minor Drainage System 10% AEP (ARI 10 years)
2. Major Drainage 1% AEP (ARI) 100 years)
6.1.2 Rainfall Intensity:
Rainfall intensities were obtained from ARR for the Noosa region.
I10 - 221 mm/h (te = 5 min)
I100 - 320 mm/h (te = 5 min)
6.1.3 Time of Concentration:
Times of Concentration (Tc) were calculated as defined in QUDM –
Table 6.1 – Tc Values
Existing (Tc) (mins) Post Development (Tc) (mins)
5.0
6.1.4 Runoff Coefficient (C10):
The 10 year runoff coefficients (C10) were obtained for the development and determined as defined in QUDM.
Table 6.2 – C10 Values
Condition C10
Existing Site 0.7
Post-development 0.9
6.1.5 Fractions Impervious:
The following values were calculated for the impervious areas: -
Site Area - 1510m2
Impervious Area - 300m2 (pre-development)
- 1316m2 (post development)
6.1.6 Peak Flows:
Table 6.3 below displays a summary of major and minor discharge rates for pre and post development conditions.
Table 6.3 – Pre and Post Development Peak Flow Rates – Rational Method
Condition Q10 (m3/s) Q100 (m3/s)
Pre-development 0.093 0.158
Post-development 0.103 0.169
6.2.1 Peak Flow Mitigation:
As shown in Table 6.3 Stormwater runoff will increase as a result of the proposed development using the Rational
Method. Therefore, it is proposed to utilise an on-site detention tank to mitigate the peak stormwater discharge
rates from the proposed development prior to discharging to the lawful point of discharge as discussed in section
4.2.
SCG Consulting engineers 7 SCG Ref: 31030(SWM)
[OCR of page images]
6.1.1 Design Storms:
Stormwater Drainage of the NSC Planning Scheme Policy outlines the following design storms.
1. Minor Drainage System 10% AEP (ARI 10 years)
2. Major Drainage 1% AEP (ARI) 100 years)
6.1.2 Rainfall Intensity:
Rainfall intensities were obtained from ARR for the Noosa region.
lio - 221 mm/h (te
loo - 320 mm/h (te
5 min)
5 min)
6.1.3 Time of Concentration:
Times of Concentration (Tc) were calculated as defined in QUDM —
Table 6.1 — T, Values
Existing (T.) (mins) Post Development (T.) (mins)
5.0
6.1.4 Runoff Coefficient (C10):
The 10 year runoff coefficients (C10) were obtained for the development and determined as defined in QUDM.
Table 6.2 — Cio Values
Condition Cro
Existing Site 0.7
Post-development 0.9
6.1.5 Fractions Impervious:
The following values were calculated for the impervious areas: -
Site Area - 1510m?2
Impervious Area - 300m? (pre-development)
1316m? (post development)
6.1.6 Peak Flows:
Table 6.3 below displays a summary of major and minor discharge rates for pre and post development conditions.
Table 6.3 — Pre and Post Development Peak Flow Rates — Rational Method
Condition Qio (m*/s) Qi00 (m/s)
Pre-development 0.093 0.158
Post-development 0.103 0.169
6.2.1 Peak Flow Mitigation:
As shown in Table 6.3 Stormwater runoff will increase as a result of the proposed development using the Rational
Method. Therefore, it is proposed to utilise an on-site detention tank to mitigate the peak stormwater discharge
rates from the proposed development prior to discharging to the lawful point of discharge as discussed in section
4.2.
SCG Consulting engineers 7 SCG Ref: 31030(SWM)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 31030 Stormwater Management Plan.pdfRelated documentApplication case desk ↗