Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2014-12-15 General Committee Agenda

of 36

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   15 DECEMBER 2014
                                      ATTACHMENT 2




                                        Page 29 of 36

Noosa Council
Capital Works Schedule
  As at: 30-Nov-2014

      Forward design for bridge rehab program                                                 0               10,500               10,500             100.00%
      Noosa Parade Munna Point Bridge - Investigations and interim                            0              185,100                6,913               3.73%
     Whole of Shire - annual bridge inspect                                              20,000               20,000               17,040              85.20%
      Noosaville - Munna Point Bridge Stage 2                                         1,401,000            1,401,000                3,518               0.25%
                                                              Total Bridges           1,421,000            1,616,600               37,971               2.35%

      David Low Way, Beach Access 49 refurbishment                                            0                    0                 400                0.00%
     Gympie Terrace and William Street Revetment wall and pathway                             0              37,100                3,600                9.70%
      Noosa Dog Beach SEMP Coastal monitoring                                                 0                    0                    0               0.00%
      Noosa Waters revetment walls - Stage 2a                                                 0               47,000              46,910               99.81%
      Noosaville - Gympie Tce / Williams St                                              40,000               60,000                    0               0.00%
     Sunshine Beach - beach access 35                                                    65,000               65,000               24,460              37.63%
     Teewah Beach - southern dunal restore                                               20,000               20,000               14,656              73.28%
      Noosaville - Gympie Tce Foreshore                                                 80,000                80,000                    0               0.00%
      Noosa Main Beach - Sand pumping pipe                                              50,000                50,000                    0               0.00%
      Noosa Waters - scour protection stage 2b                                        1,250,000            1,400,000              894,337              63.88%
      Munna Point Foreshore Stabilisation                                                     0               60,000                    0               0.00%
                                        Total Coastal Canals and Waterways            1,505,000            1,819,100              984,363              54.11%

      Pomona Cemetery - niche wall                                                        7,500                7,500                    0               0.00%
     Tewantin Cemetery - concrete beam                                                    5,500                5,500                3,290              59.82%
                                                          Total Cemeteries               13,000               13,000                3,290              25.31%

      Peregian Beach Land Acquistion                                                          0              750,000               83,391              11.12%
                                      Total Commerical Land and & Property                    0              750,000               83,391              11.12%

      Peregian Surf Club Public Amenities - Planning & Design                                 0               14,800                    0               0.00%
      Noosa Leisure Centre — design and detail                                           10,000               10,000                 421                4.21%
      Kookaburra Park Public Amenities                                                   55,000               55,000                 945                1.72%
      Mill Place Boiler House - stage 2                                                 100,000              100,000                  180               0.18%
      Noosa Aquatic Centre - pool cleaner                                                20,000               13,352               13,352             100.00%
      Noosa Leisure Centre - concertina door                                             25,000               25,000                    0               0.00%
      Noosa Library and NLC Plumbing                                                     40,000               40,000                    0               0.00%
     Sunshine Beach Skate Park - block wall                                              22,500               22,500                    0               0.00%
     Whole of Shire - community light poles                                             155,000              155,000                    0               0.00%
     Whole of Shire- public toilet / sewerage                                            35,000                    0                    0               0.00%
     Cooroy Butter Factory - condition assess                                             5,000                5,000                    0               0.00%
      Noosa Leisure Centre -upstairs flooring                                            60,000               60,000                    0               0.00%
      Noosa Regional Gallery - access                                                    45,000               45,000                    0               0.00%
      Noosa Respite Centre - internal refurb                                            150,000              150,000                    0               0.00%
      Noosa Heads - lifeguard storage survey                                             75,000               75,000                    0               0.00%
     Tait Duke House - relocation                                                       80,000                80,000                  715               0.89%
      Noosa Aquatic Centre 50m Pool Blanket Winch                                             0                7,710               7,710              100.00%
     Cooroy Library Tactile Marker Placement                                                  0               9,339                     0               0.00%
                                                 Total Community Facilities             877,500             867,700                23,323               2.69%

     Tewantin Admin Building - Chambers Fitout                                                0                    0                 687                0.00%
     Tewantin Council Office - roof rehab                                                30,000               30,000                    0               0.00%
      Noosaville Depot - replace generator                                               60,000               60,000                    0               0.00%
                                                  Total Corporate Buildings             90,000                90,000                 687                0.76%

      Purchase of Biodiversity Land                                                           0                    0                  145               0.00%
     Cudgerie - Cedar Gully Pk water feature                                            22,000                22,000               41,796             189.98%
      Noosa Trail Network 4 - bridge refurbish                                           40,000               40,000                    0               0.00%
      Noosa Trail Network 4 - Ringtail Creek                                              7,000                7,000                 697                9.96%
     Weyba Creek - bank erosion restoration                                             220,000               20,000                  101               0.50%

                                                                                                                                        Page 29 of 36
Log in to download the original file

2014-12-15 General Committee Agenda(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.