GENERAL COMMITTEE MEETING AGENDA 15 DECEMBER 2014
Page 30 of 36
Original Current Year To Date % of Annual
Project Budget Budget Actual Budget Spent
Total Environmental Assets, Bushland, Tracks and Trails 289,000 89,000 42,739 48.02%
Fleet - Plant Replacement
Whole of Shire - replace council fleet 1,735,000 1,735,000 115,622 6.66%
Total Fleet - Plant Replacement 1,735,000 1,735,000 115,622 6.66%
Gravel Road Network
Whole of Shire - gravel resheeting 410,000 410,000 133,347 32.52%
Total Gravel Road Network 410,000 410,000 133,347 32.52%
Holiday Parks
Noosa Nth Shore Holiday Park - Upgrade Septic treatment 0 11,700 0 0.00%
Boreen Point Campground - wastewater 60,000 60,000 9,756 16.26%
Noosa River Holiday Pk- Internal refurb 75,000 75,000 0 0.00%
Boreen Point Tennis Courts Renewal Stage | 0 30,000 0 0.00%
Total Holiday Parks 135,000 176,700 9,756 5.52%
Information Technology
IT Major Projects 0 128,100 72,038 56.24%
Whole of Shire - Tech One HR module 167,500 132,500 26,510 20.01%
Whole of Shire - Mobile Mapping 220,000 220,000 184,422 83.83%
Whole of Shire - corporate website 125,000 125,000 0 0.00%
Whole of Shire - replace failed UPS 12,600 12,600 0 0.00%
Civil Engineering Design Software 0 15,019 15,019 100.00%
Total Information Technology 525,100 633,219 297,989 47.06%
Parks & Playgrounds
Gympie Terrace Park Furniture Renewal program 0 0 133 0.00%
Noosa Lions Pk - Rehab Shower Facilities 0 0 0 0.00%
Noosa Botanical Gardens- Pathway renewal 10,000 10,000 200 2.00%
Noosaville - Munna Pk basket ball court 6,000 0 0 0.00%
Noosaville -Gympie Tce Foreshore BBQs 55,000 43,942 43,942 100.00%
Noosaville Lions Park- Pirate Playground 100,000 160,000 400 0.25%
Peregian Beach - Victory Park table 3,000 3,000 2,700 90.00%
Peregian Beach Pk - 3 phase switchboard 12,000 12,000 10,699 89.16%
Tewantin - Martin Park skate facility 60,000 60,000 6,797 11.33%
Whole of Shire - BBQ renewal 18,000 18,000 12,256 68.09%
Whole of Shire - park shelters 40,000 40,000 36,764 91.91%
Whole of Shire - playground renewal prog 20,000 30,000 4,570 15.23%
Whole of Shire - playground sofftfall 10,000 20,000 0 0.00%
Botanical Gardens Park Furniture Renewal 0 24,500 0 0.00%
Total Parks & Playgrounds 334,000 421,442 118,461 28.11%
Pathways & Enabling Facilities
Pomona State School Station Street Pathway improvements 0 0 0 0.00%
Weyba Creek Boarwalk Rehab Stage 1 0 19,600 0 0.00%
Gibson Road (Eumindi Noosa Rd to Thomas St) - On road cycle 0 430,800 3,397 0.79%
Sunshine Beach State School Safety |Improvements2 0 20,700 19,387 93.66%
Tewantin - pathway upgrade and lighting 270,000 270,000 0 0.00%
Noosa Heads - Park Road boardwalk design 200,000 200,000 0 0.00%
Noosa Heads - Main Beach boardwalk 500,000 0 0 0.00%
Noosa Heads - Park Rd boardwalk stage 3a 850,000 0 2,800 0.00%
Eenie Creek Pathway Stage 1 Signage 0 40,000 0 0.00%
Wallace Park Shared Path Construction 0 400,000 0 0.00%
Cooroy Noosa Road Corridor Improvement 0 230,000 0 0.00%
Total Pathways & Enabling Facilities 1,820,000 1,611,100 25,585 1.59%
Planning Scheme
Noosa Design Manual 115,000 115,000 0 0.00%
Standards Review - Standard Drawings 50,000 25,000 0 0.00%
Whole of Shire Traffic Study 100,000 100,000 564 0.56%
Noosa River Flood Mitigation Strategy 0 50,000 0 0.00%
Noosa River Hydraulic Model 0 300,000 0 0.00%
Total Planning Scheme 265,000 590,000 564 0.10%
Public Transport Infrastructure
Electric Bus Feasibility Study 100,000 100,000 49,725 49.73%
Noosa Heads - Noosa Parade Stop 114 50,000 50,000 0 0.00%
Noosa Heads - Noosa Parade Stop 26 40,000 40,000 200 0.50%
Page 30 of 36See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.