Original Current Year To Date % of Annual
Project Budget Budget Actual Budget Spent
Noosa Heads - Noosa Parade Stop 27 40,000 40,000 200 0.50%
Noosa Heads - Noosa Parade Stop 28 65,000 65,000 0 0.00%
Noosa Junction Transit Centre - improve 40,000 40,000 0 0.00%
Peregian Beach - David Low Way Stop 87 125,000 125,000 539 0.43%
Sunrise Beach - Wollomia Way Stop 11 40,000 40,000 0 0.00%
Whole of Shire - bus shelter DDA 20,000 20,000 9,219 46.10%
Noosa Bus Station Safer Streets Program 175,500 117,900 0 0.00%
Noosa Heads - Noosa Parade Translink 700596 0 410,000 0 0.00%
Tewantin - Butler St Translink 700491 0 0 270 0.00%
New Noosa Bus Shelters - Design 0 50,000 0 0.00%
Total Public Transport Infrastructure 695,500 1,097,900 60,153 5.48%
Sealed Roads Network
Annual Sealed Road Renewal & Rehabilitation Program 0 0 22,410 0.00%
Sealed Road Pavement surveys and Investigations 0 51,600 567 1.10%
Whole of Shire - pavement surveys 60,000 60,000 0 0.00%
Whole of Shire - reseal and rehab 5,000,000 5,553,610 117,946 12.93%
Noosa Heads - Noosa Parade Master Plan 100,000 100,000 0 0.00%
Noosaville - Eumundi Noosa Road corridor 20,000 79,085 0 0.00%
Emergent all infrastructure renewal 2,951,898 2,545,350 11,640 0.46%
Total Sealed Roads Network 8,131,898 8,389,645 752,564 8.97%
Sports Ground and Facilities
Girraween Sports Ground irrigation 28,000 16,000 15,350 95.94%
Girraween Sports Complex Lighting 0 10,000 0 0.00%
Total Sports Ground and Facilities 28,000 26,000 15,350 59.04%
Stormwater Drainage
Daintree Estate - Flood Mitagation Planning and Design 0 0 0 0.00%
Gympie Terrace Pipe Rehabilitation - Investigation & Design 0 11,300 0 0.00%
Rifle Street Pomona - Flood Mitigation Planning and Design 0 0 0 0.00%
Seaview Ck - open drain civil works 0 44,700 41,533 92.91%
Gympie Terrace pipe rehabilitation 200,000 200,000 0 0.00%
Re-lining of Ben Lexcen stormwater 50,000 50,000 0 0.00%
Whole of Shire - stormwater CCTV 10,000 10,000 739 7.39%
Whole of Shire - stormwater structures 150,000 150,000 0 0.00%
Whole of Shire - Flood mitigation stage 2,802,970 2,802,970 72,211 2.58%
Total Stormwater Drainage 3,212,970 3,268,970 114,482 3.50%
Streetscapes and Road Corridors
Forward Planning for Streetscape and Road Corridor improveme 0 1,715 3,215 187.49%
Peregian Beach - precinct planning 50,000 50,000 0 0.00%
Total Streetscapes and Road Corridors 50,000 51,715 3,215 6.22%
Transport and Infrastructure Management
Eenie Creek Road / Langura Street Intersection safety upgrad 0 16,503 16,503 100.00%
Eenie Creek Road / Walter Hay Drive Intersection safety upgr 0 109,100 20,174 18.49%
Weyba Road Reef Street Intersection Improvements - PIP 0 118,500 638 0.54%
Noosa Junction Disabled Parking CBA Frontage 0 20,000 1,474 7.37%
Whole of Shire - On Road Cycle Network 125,000 0 0 0.00%
Sunrise Beach - Ben Lexcen Dr school 70,000 80,000 0 0.00%
Whole of Shire - Road Directional Signs 40,000 40,000 0 0.00%
Cooroy Noosa Road - Beckmans Rd Intersec 110,000 110,000 369 0.34%
Total Transport and Infrastructure Management 345,000 494,103 39,158 7.93%
Waste Management
Noosaville Landfill - bio basin 446,900 446,900 878 0.20%
Noosaville Landfill - sediment control 297,000 297,000 2,340 0.79%
Noosaville Landfill - stormwater 50,000 0 1,760 0.00%
Total Waste Management 793,900 743,900 4,978 0.67%
Grand Total 22,676,868 24,895,093 2,866,987 11.52%
Page 31 of 36See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.