         1.0       EXECUTIVE SUMMARY


         TGM Group have been engaged by H Troon to prepare the surface water management plan for the
         proposed Bunnings Warehouse development on the corner of Eumundi-Noosa Rd and Gateway Dve,
         Noosaville. We are also required to prepare the runoff quality modelling and design of treatment
         measures to meet the requirements of the MUSIC Modelling Guidelines.

I        This report will demonstrate that the minimum runoff quality objectives can be met and exceeded


I        by the proposed stormwater treatment and harvesting measures in summary as follows;

               •   105kL capacity rainwater tank used for irrigation and toilet flushing,
               •   Bioretention cell with an extended depth of 0.1m and mean area of 615m2,
               •   Gross pollutant traps on most inlets to the bioretention basin,



I        The following modelling results were achieved using MUSIC:

                                                       Residual        Residual    Reduction                 % Reduction
                                                        Load             Load      Target %                  (SOmm/hr)*
                                        Source          (200          (SOmm/hr)                % Reduction
     arameter                            Load          mm/hr)                                  (200mm/hr)*
    Flow (ML/yr)                            27.5           26.3             26.3         NA            4.2           4.2
    Total Suspended Solids (kg/yr)          6660            469              582          80            93          91.3
    Total Phosphorus (kg/yr)                23.1           4.69             4.51          60          79.6          80.4
    Total Nitrogen (kg/yr)                  86.2   _       44.9             45.8          45          47.9          45.8
    Gross Pollutants (kg/yr)              627         0.0         0.0        90              100                     100
         * Relative results for hydraulic conductivity of 50mm/hour and 200mm/hr for the filter media in
         bioretention cell.




         2.0       WATER QUANTITY


         2.1       Rainfall Data

         The development has not changed location and as such no change to rainfall data is necessary.
         However, for detention basin calculations rainfall hyetographs were used to simulate real rainfall
         events in DRAINS.




                                                                  4

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Change Current Application.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.