    2.2        Runoff Volumes & Flows

    The site has changed size and layout. The total development site area is approximately 2.32 Ha. The
    development site and amount of impervious area have significantly reduced in size, thus runoff
    volumes have significantly reduced compared to those calculated by Cardno in the original report.
    The new areas are as follows;




            Surface Type          Original Areas           Proposed Areas (TGM
                                 (Cardno Report)                  Report)

                                         (Ha)                         (Ha)



    Roof                                0.7884                       0.667

    Impervious Ground                   1.325                        1.20
    Surface

    Pervious Areas                      0.352                        0.456

I
    TGM note that the CARDNO report calculated runoff from the site layout prior to this development
    using RAFTS and it then compared to the result calculated using the rational method. Results of the
    comparison between the RAFTS and rational methodologies indicated that runoff flow rates were

I   close and therefore it is expected that a pro-rata adjustment of those flows for the new site areas
    will also give acceptable results (i.e. existing discharge calculations adjusted by a factor of
    2.327Ha/2.7543Ha).




    DRAINS uses rainfall hyetographs from Australian Rainfall & Runoff to simulate actual rainfall events.
    The hyetographs mimic the variation in rainfall during a rain storm, therefore for any given average
    rainfall intensity DRAINS simulates the peaks and troughs during the storm, so that peak runoff flow
    rates may be more than when calculated using the average intensity.

    2.2.1      Detention Basin

    It is anticipated that all paved areas can be collected and discharged via the detention basin and the
    legal point of discharge in Gateway Drive. The construction stage sedimentation basin will be
    cleaned at the end of the construction phase and converted into a detention basin and bioretention
    cell.

    The outlet pipe from the basin shall be 600mm diameter. The invert of the outlet pipe will be set
    300mm above the invert of the basin to allow for an extended detention period for the
    sedimentation basin. It is assumed that the extended detention depth is full at the commencement
    of the design storms for the purpose of sizing the detention basin.

                                                      5

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Change Current Application.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.