             every 6 months, and this will give a quick and obvious indication of the performance of the
             GPT's. If there is evidence of significant gross pollutants and sediment accumulating at the
             bioretention cell inlets then this would be an indication that the GPT's may not be
             performing adequately.            Records should be kept of visual assessment and corresponding
             photographs taken.




    5.2      General Performance of Bioretention Basin

             Visual assessments of the basin should be carried out during routine maintenance, but not
             less than every 6 months. Figure 1 below gives guidance on indications of problems, their


I
             likely causes and rectification measures.

                Parameter         Indicator of       Possible Cause                      Possible Management Action(s)


I
                Plant health      Too much           System undersized                   Replace filter media with that of a
                                  water                                                  higher infiltration capacity
                                                     Poor infiltration capacity (water   As above


I                                 Too little
                                  water
                                                     lo¢ai ng)
                                                     System oversized (eg. plants
                                                     further from inlet are drier)
                                                                                         Consider Installing a choke on outlet
                                                                                         OR
                                                                                         Replant with dry tolerant plants
                                                     Inlet levels wrong (system is       Reset inlet levels
                                                     bypassing too early)
                                  Poor flow          Excessive inflow velocities (at     •   Install/augment energy
                                  control            inlet)                                  dissipation device
                                                                                         •   Relocate inlet
                                                     Inadequate provision for bypass     •   Install/augment energy
                                                     of high flows (damage                   dissipation device
                                                     throughout system)                      Reconfigure inlet to prevent high
                                                                                             flows entering system
                                                                                         •   Relocate inlet
                Erosion           Poor flow          Excessive inflow velocities         •   Install/augment energy
                                  control                                                    dissipation device



I
                                                                                         •   Relocate inlet
                                                     Inadequate provision for bypass     Reconfigure Inlet to prevent high
                                                     of high flows (damage               flows entering system
                                                     throughout system)
                Build-up of       Clogging           Excessive loads of sediment         •   Install pre-treatment device (see
                sediment on                                                                  Chapter 3 for ideas)
                filter surface                                                           •   Scarify the filter surface
                                                                                             between plants and/or densely
                                                     System undersized
                                                                                             vegetate to break up the
                                                     Inadequate pre-treatment                clogging layer



                                                            Figure 12


    5.2.1    Additional advice on filter media performance




    2 FAWB Stormwater Biofiltration Systems Adoption Guidelines Table 6.


I                                                               12

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Change Current Application.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.