Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Request to Change Current Application · OPW11/0023

of 66

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

I
    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                                  4(.^ Cardno

    LIST OF TABLES

    Table 1              Rainfall Parameters for Rockhampton ..................................................................... 2
    Table 2              RAFTS Model: Area and Slope ............................................................................... 2
    Table 3              Rational Method Calculations .................................................................................. 3
    Table 4              Rational Method vs RAFTS Results ........................................................................ 3
    Table 5              Detention Basins Stage Storage Curves ................................................................. 3
    Table 6              Detention Basin Sizing Results ................................................................................ 4
    Table 7              Detention Basin Sizing Results - including unattenuated car park area ................. 5
    Table 8              BCC Swale Design Guidelines ................................................................................ 6
    Table 9              Stormwater Management Practices ......................................................................... 8
    Table 10             Water Quality Objectives ....................................................................................... 10
    Table 11             Bioretention Device Parameters ............................................................................ 13
    Table 12             Total Annual Loads ................................................................................................ 13
    Table 13             Rainwater Tank Performance ................................................................................ 14
    Table 14             Detention Basin Parameters: Summary ................................................................. 18

    LIST OF FIGURES

    Figure 1             Schematic Treatment Train
    Figure 2             Locality Plan
    Figure 3             Existing Site
    Figure 4             Proposed Site and Conceptual Drainage Layout


    APPENDICES

    APPENDIX A                 RAFTS Results
    APPENDIX B                 MUSIC Parameters
    APPENDIX C                 Statement of Landscape Intent




    Bunnings Warehouse                                                 Version 1                                           15 December 2006
    J 13501- 541WP\SWMP doc                                   Commercial in Confidence                                                 Page iii

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Change Current Application.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.