Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Request to Change Current Application · OPW11/0023

of 66

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                            IIC^ Cardna

    1.          INTRODUCTION

                A Bunnings Warehouse is proposed for a site on the corner of Eumundi-Noosa Road and
                Gateway Drive in Noosaville. The site falls under the jurisdiction of Noosa Shire Council.

                Development has the potential to increase the rate of runoff from the site, possibly leading
                to flooding issues downstream. Human activity on the site will also bring with it the
                potential to adversely affect the quality of runoff, through the transport of debris, litter,
                petrols, oils and lubricants and so on from impervious areas. However, the existing site is
                not undisturbed; it has been cleared and appears to be used as a stockpile area for
                aggregates.

                In accordance with the requirements to maintain post-development runoff quantity and
                quality, this document details the preliminary sizing and modelling of the detention
                requirements and stormwater quality treatment train for the development, using Water
                Sensitive Urban Design techniques. The final type, capacity and dimensions of the devices
                will be subject to detailed design at a later stage.

                1.1          Landscape Intent
                A Statement of Landscape Intent (11 December 2006) has been prepared by Arterra
                Landscape Architects, and is included as Appendix C. It describes the general landscaping
                across the site, and includes a summary of the Water Related Design Principles described
                and modelled within this report.




I
I
I



    Bunnings Warehouse                                  Version 1                             15 December 2006
    J \3501-541WP1SWMP.doc                       Commercial in Confidence                               Page 1

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Change Current Application.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.