BUNNINGS WAREHOUSE. NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN C07) Cardno
2.5.1 Areas with impractical gradients
It may be noted that levels across the site may be such that it will be difficult or impractical
I to route runoff from certain areas to the detention basin. To ensure adequate falls across
the car park, for example, a cut and fill operation is envisaged which will require the use of
a retaining wall along the western boundary. It has been suggested that in this area,
I surface water is released direct to the outlet Swale without passing through the detention
basin (although three-month flows will still pass through bio-retention devices). To ensure
that surface water runoff rates following development are equal to or less than those
existing, even with an unattenuated area of almost 2500m , the RAFTS model was
amended and revised results calculated. The results are shown in Table 7 below.
Table 7 Detention Basin Sizing Results - including unattenuated car park area
Event Existing (m'/s) Stage (m) Volume (m3) Site Outflow (m3/s)
100 0.785 1.06 1325 0.575
50 0.698 0.95 1193 0.522
20 0.594 0.84 1 1046 0.471
I 10
5
I
0.508
0.446
0.224
0.73
0.66
0.41
909
822
518
0.403
0.350
0.209
It can be seen that for each storm event, the outflows from the site as a whole (the outflow
refers to the site 'end' node and not the basin) remain less than the existing rates.
Paradoxically, allowing certain areas of the site to drain direct to the swale does not
increase the overall peak runoff rate in this case. This is likely to be because the times of
concentration (the time taken for the runoff to arrive at the discharge point) for each area do
not coincide, and this creates two smaller peaks in the hydrograph over a longer period of
1 time.
2.6 Outlet
A single 525mm pipe was adopted for the basin outlet and, as described above, set with an
invert level 300mm above the bottom of the basin. This outlet pipe will drain through the
bund, is 10 metres long and set at a grade of 0.5 per cent. The overflow spillway level was
set at 1.15 metres above the invert of the basin (at the downstream end) and is 20 metres
wide.
The overflow weir becomes operational only in events approaching the 100-year return
period, when it would experience a flow depth of approximately 10mm.
As stated, the outlet pipe has been placed with its invert set at 300mm above the 'floor
level' of the basin. This provides storage for the containment and stilling of runoff from
events of up to the three-month average recurrence interval. These flows will not exit from
the basin via the stormwater pipe, but instead through a lower and smaller pipe through a
longer period of time. Using this approach, the option also exists to install a sandy loam
bioretention filter placed in the floor of the basin to further improve the treatment train.
r Flows from the detention basin will be released via the outlet to a vegetated Swale, running
in a northerly direction along the western boundary of the site. An outline sizing of this
Swale is provided in the following section.
Bunnings Warehouse Version 1 15 December 2006
J ^3 O 1-541WP1SWMP doc Commercial in Confidence Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Change Current ApplicationRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.