    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                  <4^ Cardna

    3.           SWALE SIZING

                 Discharges from the detention basin will travel along a grassed swale in a northerly
                 direction along the western boundary. A HECRAS flow model was constructed to analyse
                 the performance of a such a swale.

                 From Table 6 it can be seen that the peak outflow in the 100-year event equates to 0.609
                 m3/s. Mannings equation was used to arrive at an outline size for the Swale. The swale
                 was a total of 5m wide, 0.3m deep, and sides sloping at 1 in 6, meeting at a base of 1.4m
                 width. The Swale would be approximately 150 metres long, and set at a gradient of around
                 1.5%. At this outline design stage, bends and constrictions were not modelled (driveway
                 crossings would need to be elevated in order to avoid wide and shallow cross sections).
                 Cross sections were input to HEC-RAS, a value of Manning's n of 0.06 was selected, and
                 the above derived flow of 0.609 m3/s was applied to the head of the run.

                 As swales are generally accessible by the public, design guidelines are available that
                 ensure that safety considerations are met in terms of bank slope, flow velocity and depth.
                 Brisbane City Council's Draft WSUD Engineering Guidelines (August 2005), for example,
                 lists typical design parameters which have been reproduced in Table 8 below. The results
                 of the HECRAS analysis are also included in the table.

                 Table 8       BCC Swale Design Guidelines

                   Design Parameter                                               Typical Value    Actual Value

                   Swale longitudinal slope                                          1 to 4%           1.5%

                   Swale side slope (for areas not requiring access, eg. Parks,    1:3 to 1:10          1:6
                   easements, median strips)

                   Swale side slope for trafficability (for footpaths with 'at-     Max 1:9             n/a
                   grade' crossings)
                   Swale side slope (elevated driveway crossings)                  1:3 to 1:10          1:6

                   Manning's n (with flow depth less than vegetation height)       0.15 to 0.4          n/a


a                  Manning's n (with flow depth greater than vegetation height)

                   Maximum velocity for scour in minor event (eg. Q2)
                                                                                   0.02 to 0.05

                                                                                     0.5 m/s
                                                                                                       0.05

                                                                                                      0.5 m/s

                   Maximum velocity for Q50                                          2.0 m/s          0.6 m/s

                   Depth x velocity for high risk locations                         <0.4 m2/s
                                                                                                     0 . 2 m 2/s
                   Depth x velocity for low risk locations                          <0.6 m2/s
                   Maximum depth of flow, Q50                                         0.3m            0.28 m


                 As can be seen from the table, the Swale is adequate to convey the anticipated flows while
                 meeting minimum safety criteria. However, the design levels at the basin outlet, at
L                approximately 15m AHD, fall to approximately 11m AHD at the northern end of the site - a
                 fall of around 2.6%. The difference between the Swale slope used above and the actual
                 slope on site can be reduced through the use of simple rock dams placed at predetermined
                 drops in the channel level, creating attractive weirs or waterfalls along the length of the
                 swale.

                 Further modelling will be required at the detailed design stage to accurately model all
                 bends and constrictions in the swale's route through the site and the addition of local
                 surface water discharges to the flow. However, the analysis demonstrates that it will be
                 possible to provide a Swale to convey flow.



    Bunnings Warehouse                                        Version 1                           15 December 2006
    J.\3501-54\WP\SWMP.doc                           Commercial in Confidence                               Page 6

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Change Current Application.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.